TY - JOUR ID - TI - Use Of Availability Simulation To Find Optimum Period Of Time Between Schedule Maintenance AU - HUSSAIN A. M. AL-BAWI AU - Z. I. AL-DAOUD PY - 2010 VL - 16 IS - 3 SP - 5633 EP - 5643 JO - Journal of Engineering مجلة الهندسة SN - 17264073 25203339 AB - This paper is concerned with the investigation of the optimum period of time between maintenance by the aid of Monte Carlo simulation technique of an old water tube boiler, double identical drums; its capacity is 70 ton/ hour of super heated steam. There are a multitude of failures that are caused by boiler operator's errors, boiler inspector, boiler maintainer and faults of boiler auxiliary equipments which lead to operation parameter deviations and boiler shut down. Changing maintenance plan to be based on optimum period of time between scheduled maintenance and inspection will achieve maximum boiler availability.

يتعلق هذا البحث في دراسة وايجاد افضل فترة زمنية بين الصيانات المبرمجة بأستخدام اسلوب المحاكاة لمرجل بخاري قديم ذو وعائيين متناظرين علوي وسفلي طاقته الانتاجية 70 طن لكل ساعة من البخار المحمص. يتعرض هذا المرجل لحالات فشل عديدة نتيجة لاخطاء الكادر التشغيلي وكادر الصيانة والفحص لهذا المرجل اضافة الى فشل بعض المعدات الملحقة بالمرجل والتي تؤدي الى حدوث انحرافات في المتغيرات التشغيلية وبالتالي توقف المرجل. ان تغيير خطة الصيانة والفحص بحيث انها تعتمد على افضل زمن بين الصيانات والفحص المبرمجة سيؤدي الى تحقيق افضل توفرية ممكنة للمرجل البخاري. ER -