استخدام المخططات الشبكية في انتاج الاجهزة الكهربائية

Abstract

From time to time raised the problems of time and cost and optimum utilization of available resources in order to achieve the goals set speed and quality required and thus set a timetable for a major project , is a challenge for all or most managers , especially when they are high adventure . How many millions of dollars wasted due to poor planning of production. As the delay in achievements is the natural result of inaccurate schedule, which may lead to the bankruptcy of companies due to lack of proper control over the activities of the production process. The research aims to recruit schemes retina in scheduling and production planning because of such schemes of benefits in monitoring the activities of the production process , and to apply the idea of research on a product electrician is (KIOSK) and relying on the tracks technological been prepared scheme Plexiglas’s for the product and then work to transform the planned network to model athlete linear to calculate the length of the critical path , which represents the longest path in the production process , and through the work of the sensitivity analysis (analysis of post- optimization ) has access to the upper limits of the implementation of events and times , which enables laboratory departments to take advantage and control of the end their specific their time.