Relay operational business machine one situation in Baghdad sewing plant study

Abstract

Presented research question various business schedule on the machine and one to address the problem of business scheduling, and has developed a scheduling theory to solve problems that include production, as the core issue of scheduling can be described generally as pertaining to the creation of the implementation period for each job (job) on the machine and one of the machines that can implement that function so that all restrictions be realized, this process is called scheduling (schedule), and has applied to the stitching Baghdad plant and in 2010, relying on metrics to assessment scheduling operations called static rules that are (1-base contained, first served(FCFS), 2- base early maturity date(EDD), 3-base longest runtime operating base Luxor(LPT), 4- runtime longest(SPT), 5-critical base percentage (CR), 6- Slack base (S)).He concluded Find a set of conclusions and recommendations, as she was the most important recommendations (the need to work with al-Qaeda (runtime longest SPT) and Al Qaeda (early maturity EDD) because of their impact on reducing the cost of inventory under operating, as well as the need to avoid work to rules (Luxor runtime LPT) and (critical ratio CR) being the least effective, with working out with regard to provision of average achievement).