القيمة التقديرية لكلفة متر مربع تحت البناء في مدينة كربلاء المقدسة

Abstract

After daily Observation to register costs of materials and daily wages for four buildings in Kerbala city All these results were Organizing in tables. The in consistency analyzation indicate the cost to Product square meter idemtity for all buildings as statistically watching Also we attain the cost for square meter ( 464488 , 377964 , 409812 , 420683 )I.D Respectively with standard deviation (36322) More cost materials were [ reainforcment , (T5) , cement (T4) , bricks (T1) ] and also more working cost were (T21) , (T24) , (T26)