THE USE OF SEQUENCING TECHNIQUE IN IMPLEMENTING REQUIRED WORK AND TRAINING STUDENTS IN TURNING WORK SHOP.

Abstract

The present paper aims at studying the possibility of using sequencing technique in implementing required works done by student with the Application schedule, and determining the mean of flow time to do exercise on lathe machine to make the utmost use of time and skill of students.The results reached that have shown there is a noticeable waste of time used to produce exercises due to the unavailability of a flow chart for the work in addition to weaknesses in the students skills through consuming a great deal in raw materials in exercises more than once. It is noteworthy that the technique used in analyzing results is (LPT&SPT).