Article
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
جدولة المشروع باستعمال أسلوب برمجة الأهداف – بحث تطبيقي في مشروع القرية العصرية (محور ألابنية السكنية) في محافظة واسط

Authors: وقاص سعد خلف --- تمام سلمان خضر
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2015 Volume: 21 Issue: 85 Pages: 169-201
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time .

ان من اهم التحديات التي تواجه ادارة المشروع في الوقت الحاضر هو ضمان انجاز المشروع على الرغم من خضوعه لقيود محدده منها قيود تتعلق بالوقت واخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فان هذا الامر يتطلب حساب دقيق للوقت والكلفة, فمشروع القرية العصرية (محور الابنية السكنية) هو احد المشاريع الضخمه والتي تسعى وزاره الزراعه الى انجازها في محافظة واسط حيث تم اختيار هذا المشروع بوصفه من المشاريع التي فيها العمل متلكأ وعلى هذا الاساس تمت دراسة المشروع من جديد وفق الاساليب العلميه والرياضية الحديثه حيث استعمل احد اساليب جدولة وادارة المشروع وهو أسلوب المسار الحرج (CPM) لايجاد وقت انجاز مشروع الابنيه السكنيه علما ان الكثير من الانشطة في شبكة المشروع لم تكن العلاقات بينها تقليدية (من نوع Finish to Start) كما تضمنت وجود فترات التقديم والتاخير (Lead and Lag) بينها وعليه تم استعمال احد البرامج الرائده في إدارة وجدولة المشروع وهو برنامج PrimaveraV6)) لايجاد وقت وكلفة انجاز المشروع في الظروف الطبيعية والتعجيلية، وبما ان لادارة المشروع اهداف عديدة ومنها متناقضة تسعى الى تحقيقها في ان واحد الامر الذي يتطلب الجهد الكبير وصعوبة الوصول الى القرارات المناسبة والدقيقة من قبل متخذ القرار فكان لابد من استعمال اسلوب رياضي كفوء وهو برمجة الاهداف (Goal Programming) لتحقيق هذه الاهداف حيث بينت النتائج المستحصلة من حل الإنموذج الرياضي باستعمال احد البرامج الجاهزة (WinQ.S.B V2) الى اهمية هذا الاسلوب وكفاءته في جدولة مشروع القرية العصرية (محور الابنية السكنية) في ظل وجود اهداف عديدة ومتناقضة لادارة المشروع حددتها وفق اهميتها وتسعى الى تحقيقها في ان واحد.


Article
Effect of risk management in the performance of the project Applied study for the project of the buildings of the General Company for Agricultural Supplies Formations of the Iraqi Ministry of Agriculture
تأثير إدارة المخاطر في أداء المشروع دراسة تطبيقية لمشروع بنايتي الشركة العامة للتجهيزات الزراعية احد تشكيلات وزارة الزراعة العراقية

Authors: تمام سلمان خضر --- مروة بدر زيا يوسف
Journal: Journal of Baghdad College of Economic sciences University مجلة كلية بغداد للعلوم الاقتصادية الجامعة ISSN: 2072778X Year: 2018 Issue: 56 Pages: 145-164
Publisher: Baghdad College of Economic Sciences كلية بغداد للعلوم الاقتصادية

Loading...
Loading...
Abstract

The risks faced by the projects of the determinants that hinder the work of those projects and limit their effectiveness and efficiency and thus negatively reflected on the performance and success, which requires them to actively manage adopt proper planning and organization efficient overall to face those dangers objectivity and control through the prediction and see what will happen in the future of the dangers , included search of risk management as a independent variable subsidiary for its removal (risk management, project management, risk identification, risk transfer, risk reduction) and performance of the project as the dependent variable sub for its removal (cost, time, learning and creativity, quality), has been selected sample of workers to complete the project two buildings belonging to the General company for Agricultural Supplies one of the formations and the Iraqi Ministry of Agriculture, as adopted by searching on the opinions of employees totaling 103 workers. It focused research problem in the extent of knowledge of project management risks and how to address them and to minimize their effects, which may face the project at any stage of its life cycle, sought search to achieve a set of objectives, including: description of the dimensions of risk management and performance of the project and the impact of the dimensions of risk management on the performance of the project from terms of success or failure and test correlation and impact between them and to achieve adopted Find the descriptive and analytical approach as used researchers questionnaire on the practical side were relying on statistical program these goals (spss) to test and analyze the assumptions adopted by the research, the research found a total of conclusions by testing and analysis of assumptions adopted by the research, also concluded Find a set of recommendations could adopt them by the management of the project.

تعد المخاطر التي تواجه المشاريع من المحددات التي تعيق عمل تلك المشاريع وتحد من فاعليتها وكفاءتها وبالتالي تنعكس سلبياً على أدائها ومدى نجاحها ، مما يتطلب منها إدارة فاعلة تتبنى التخطيط السليم والتنظيم الكفوء والرقابة الموضوعية الشاملة لمواجهة تلك الاخطار من خلال التنبوء والترقب بما سيحدث في المستقبل من اخطار، تضمن البحث إدارة المخاطر كمتغير مستقل بأبعاده الفرعية (إدارة المخاطر وإدارة المشروع ، تحديد المخاطر، نقل المخاطر، الحد من المخاطر ) وأداء المشروع كمتغير تابع بأبعاده الفرعية (الكلفة، الوقت، التعلم والابداع، الجودة ) , تمحورت مشكلة البحث في مدى معرفة منفذين المشروع بالمخاطر وكيفية مواجهتها والتقليل من آثارها ومدى امكانية رفع اداء المشروع في ظل المخاطر التي قد تواجه المشروع في أي مرحلة من مراحل دورة حياته ، كما سعى البحث الى تحقيق مجموعة من الأهداف أهمها : وصف ابعاد إدارة المخاطر وأداء المشروع ومدى تأثير ابعاد إدارة المخاطر على أداء المشروع من ناحية نجاحه او فشله واختبار علاقة الارتباط والأثر بينهما, ولتحقيق ذلك جرى اختيار مشروع بنايتين تابعتين للشركة العامة للتجهيزات الزراعية احدى تشكيلات وزارة الزراعة العراقية كعينة للبحث ، إذ جرى توزيع الاستبانة على الاداريين والفنيين والعاملين بكافة المستويات والبالغ عددهم (103) شخص ,اعتمد البحث على المنهج الوصفي التحليلي حيث استعمل الباحث اجوبة الاستبانة كأداة تحليلية في الجانب العملي بالاعتماد على البرنامج الاحصائي (spss) لاختبار الفرضيات التي اعتمدها البحث، وتوصل البحث الى مجموعه استنتاجات من خلال اختبار الفرضيات التي اعتمدها البحث، كما اختتم البحث بمجموعة توصيات من الممكن الاخذ بها من قبل إدارة المشروع .