research centers


Search results: Found 16

Listing 1 - 10 of 16 << page
of 2
>>
Sort by

Article
Evaluation of the Performance of the Dora Refinery Wastewater Treatment Plant

Authors: Muwafaq A. Abed --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2008 Volume: 14 Issue: 4 Pages: 3020-3035
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Oil refineries are major contributors to local environmental problems .The main pollutants are oil , dissolved components , spent acids , suspended solids, sludge . Technically it is possible to remove all these pollutants by Physical , chemical and biological means .Oil is initially removed in the (API) separators , by skimming, while the heavy particles by scrapping . Further removal of discrete particles is done by gravity settlement in the primary settlement tank .The remaining suspended matter is removed by chemicals , that are added in the flocculation tank , while further flocs are removed in the air flotation tank . The biological treatment follows to remove the biological pollutants , usually followed by secondary settlement to reduce the flux of suspended particles carried with the effluent water. This thesis deals with the Dora refinery wastewater treatment plant , its present performance in comparison with the designed treatment performance and its final effluents compared with the Iraqi discharged water quality limitations .In order to identify the characteristics of the refinery effluents and to evaluate the performance of the refinery wastewater treatment plant , wastewater from different treatment stages were analyzed for various physical and chemical parameters . Using these parameters as the criteria of performance , comparisons were made between the actual and the designed performance for various potential pollutants. The sampling was conducted during 6 months from May to October 2006 , with two samples in each month for each of the units, one before , and one after.The results showed that the wastewater treatment plant in Al-Dora Refinery performed significantly, where high removal efficiencies , were obtained. For T.S.S , Oil , COD , BOD , Sulfide and Phenol which were 95% , 88% , 86% , 81% , 85% and 97% respectively . And the plant was not very efficient in NH3 , SO4 and PO4 removal .

ان المصافي تعتبر عالميا مساهم رئيسي في مشاكل البيئة الموقعية . اهم الملوثات الناتجة من المصافي والتي تنصرف مع المياه هي النفط ومركباته ,المواد المذابة والعالقة , الحوامض , الحمأة وغيرها . فنيا بالامكان ازالتها جميعا باساليب فيزياوية , كيمياوية وبايلوجية .حيث يتم ازالة النفط اولا في محطة المعالجة في خزانات خاصة للعزل وذلك بترك المياه فيها وقشط النفط الطافي على السطح وكذلك قشط المواد المترسبة في القعر . وتكون عملية الفصل في هذه الخزانات بفعل الجاذبية الارضية . تلي هذه المرحلة عملية فصل للمواد العالقة وذلك بخلط مواد كيمياوية مخثرة مع المياه في خزانات التخثير والدمج ومن ثم يتم تطويف المواد العالقة والمتكتلة في خزانات التطويف حيث يتم قشطها من السطح ومن قعر الخزان باستخدام القاشطات الخاصة لذلك . تتبع هذه العمليات عملية المعالجة البايلوجية , والتي يتم فيها معالجة المواد الذائبة بفعل الاحياء المجهرية (البكتريا ) ومن ثم يتم فصل هذه الملوثات وترسيبها في احواض الترسيب النهائي لفصل ما تبقى من المواد العالقة والمتجمعة والاحياء الحية المجهرية لتقليل جريانها مع المواد المنصرفة الى النهر. المعالجة البايلوجية في مصفى الدورة تستخدم التهوية الممتدة ووحدات الحمأة المنشطة . يتوفر في وحدات المشروع الاجهزة اللازمة للقشط والخلط والتهوية , وأحياء مجهرية حية تتغذى على الملوثات المجهرية . تستخدم هذه الدراسة أسلوب البحث والتحليل الاحصائي للبيانات المستحصلة من قراءات التحاليل الكيميائية للنماذج المأخوذة من مختلف المواقع في محطة المعالجة . وطريقة اخذ النماذج المتبعة كانت نموذج قبل وبعد كل وحدة من وحدات محطة المعالجة ولمدة ستة اشهر وللفترة من ايار وحتى تشرين الاول من عام 2006 وبواقع فحصين كل شهر وللملوثات:- (pH ,Oil , T.S.S , BOD5 ,COD ,N-NH3 ,Sulfide ,Sulfate , Phosphorous and Phenol ) النتائج اظهرت الاداء الكفوء لمحطة المعالجة في ازالة الملوثات (T.S.S ,OIL ,BOD , COD ,Sulfide , Phenol ) حيث سجلت اعلى نسبة ازالة لهذه الملوثات وهي 95% , 88% , 86% , 81% , 85% و97% على التوالي وكذلك النتائج اظهرت ان محطة المعالجة ليست كفوءة جدا في ازالة الملوثات NH3 , SO4 and PO4 .


Article
Building an Integrated System for Management of Projects ((Some Water Projects as a Case Study))

Authors: Ziyad J. Fadhal --- Rafa H. Al- Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2009 Volume: 15 Issue: 1 Pages: 3347-3367
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Many useful softwares in projects management are available now. Ms Project and Primavera are some examples of these softwares. Those programs need to be fed by information by the user. The users usually collect this information from the project and design documents. This collection process needs considerable time and efforts, and usually accompanied of some errors in data transfer process.In order to reduce the required time and efforts and to eliminate individual errors in data transfer process, an Integrated System is needed. This Integrated System can extract the graphical information from an AutoCAD drawing and transfer it to a digital form suitable for processing in the project management softwares such as Excel and Ms Project.In this research an Integrated System (IS) was built, to connect three softwares, AutoCAD, Excel and Ms Project, using Active X data transfer technology. The Integrated System was tested using three case studies. Al-Nahrain University waste water network, the Islamic University water supply network, and an irrigation and drainage project. The results indicated the capability of the system to transfer the graphical data into digital data, and to conduct the quantity of survey of the selected projects.It is worthy to mention that this system requires some modification that is should be adopted in the AutoCAD drawings. The drawings should be performed using layers, and definition blocks for objects. These modifications are simple and can be done easily. Moreover the system was built in a way that gives the ability of adding other case studies (i.e., other types of projects).

تتوفر العديد من البرامجيات الهندسية المفيده في ادارة المشاريع. مثل هذه البرامج على سبيل الذكر هي (Ms project, Primavera) وغيرها . أن هذه البرامجيات تحتاج الى التغذيه بالمعلومات من قبل المستخدم حيث يقوم المستخدم عادة بجمع المعلومات من المصادر المطلوبه مثل وثائق المقاوله ومخططات التصميم وغيرها. ان عملية جمع هذه المعلومات وادخالها يصاحبها جهد ووقت وقد تتعرض هذه العمليه الى حدوث اخطاء في نقل المعلومات.ولتوفير الجهد والوقت وتقليل الاخطاء في نقل المعلومات يتطلب انشاء نظام متكامل يقوم باستخلاص المعلومات قدر الامكان من وثائق ومخططات المقاوله وتحويلها من صيغتها الفعليه الى الصيغه الملائمه لتشغيل برامجيات ادارة المشاريع. Iهذا النظام المتكامل بامكانه استخلاص المعلومات الرسوميه من مخططات ال (AutoCAD) وتحويلها الى ارقام مناسبه للمعالجه في برامج ادارة المشاريع مثل (Excel and Ms Project).في هذا البحث تم بناء نموذج متكامل لربط البرامجيات (برنامج اوتوكاد، مايكروسوفت أكسيل و مايكروسوفت بروجيكت ) بحيث يقوم النموذج باستقراء المعلومات من المخططات التصميميه المرسومه ببرنامج (AutoCAD)وتحويلها مباشره الى برنامج (Excel) وبرنامج(Ms Project) بصيغه عدديه بحيث يمكن التعامل معها بسهوله لايجاد الكميات وبناء نظم اداره المشروع بشكل سريع ومباشر.تم بناء النموذج المتكامل باستخدام البرامجيات اعلاه وربطها بتقنيه (Active X) التلقائيه. تم تجربه النموذج المتكامل على ثلاث حالات دراسيه وهي شبكة مجاري لموقع جامعة النهرين وشبكة ماء لموقع الجامعه الاسلاميه وشبكة قنوات الري والبزل. اثبتت النتائج فعالية النموذج في تحويل المعلومات من صيغتها الرسوميه الى صيغ عدديه يمكن التعامل معها بسهوله ويسر بالبرامجيات المشموله بها.ومن الجدير بالذكر بان النموذج يتطلب ان يتم رسم المخططات التصميميه ببرنامج الاوتوكاد مع بعض التاشيرات الطفيفه في هذا البرنامج لكي يتمكن النظام بالعمل المطلوب ، مثل اجراء الرسومات بصيغ الطبقات ال(Layers) وحصر الاشكال (Objects) بلوحات التعريف (Blocks) وهي متطلبات بسيطه يمكن تنفيذها بسهوله.كما ان النظام تم بناءه بطريقه مرنه بحيث يمكن اضافة اي حاله اخرى (اي مشاريع اخرى).


Article
Two-Dimensional Numerical Model for Thermal Pollution of Singel Source in River

Authors: mohsin Jasim Nasir --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2006 Volume: 12 Issue: 1 Pages: 25-35
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The aim of this research was to apply a numerical model capable of describing the thermal pollution in rivers. For this purpose a two dimensional numerical model was applied for estimating temperature distribution in a river.Momentum Conservation Equation and Thermal Energy Equation were used to describe the distribution and diffusion of temperature along the river subjected to thermal pollution point source. Furthermore, the model incorporates the ( k-e) turbulence model to calculate the distribution of turbulent viscosity. The pressure distribution was determined using hydrostatic pressure equation.The partial differential equations were formalized and simplified to be solved using Alternative direction implicit-explicit method ( ADI) with upwinding technique. The resulting system of linear simultaneous equations were then solved using Gauss-Elimination method. A laboratory physical model was built to find experimental data. These data were used for model verification with data obtained from Al-Daura power station and Tigris river.The model was found to be in sensitive to the wind speed. The comparison of observed results from Al-Daura power station and laboratory physical model with those computed by the numerical model show a good agreement. The maximum absolute difference percentage are ( 16.2%, 8.6%) respectively.

يهدف البحث الى بناء نموذج عددي لدراسة التلوث الحراري في الانهار الناجم عن مصدر للتولث الحراري . ولهذا الغرض تم استنباط نموذج رياضي عددي لتمثيل هذه الظاهرة والتنبؤ بتوزيع درجات الحرارة داخل النهر . تم استخدام معادلة حفظ الزخم ومعادلة حفظ الطاقة ومعادلات التوزيع الحراري لمعرفة توزيع وانتشار درجات الحرارة خلال منطقة الدراسة وكذلك تضمن النموذج العددي معادلات الاضطراب ( k-e)لحساب معاملات اللزوجة . كما تم اعتماد معادلات الضغط الهيدروستاتيكي لحساب الضغط في كل نقطة خاصة بالدراسة.تم تبسيط المعادلات التفاضلية المختلفة الاشكال بطريقة الاتجاه المتناوب (الضمني - الصريح) للفروق المحدد (ADI)مع تطبيق منظومة Upwinding للحصول على معادلات جبرية خطية تم حلها بطريقة الحذف المتناوب (Gauss - Elimination) كما تم بناء نموذج مختبري لاغراض عمل التحقيق لهذا النموذج العددي . لقد وجد ان النموذج حساس الى سرعة النهر والى تغير الكثافة وان النموذج غير حساس لتغير سرعة الريح.خلال مقارنة النتائج المقاسة في نهر دجلة اسفل محطة كهرباء الدورة التي تعتبر مصدر تلوث حراري للنهر ونتائج النموذج المختبري مع النتائج المحسوبة من النموذج العددي الرياضي نلاحظ انها مقبولة الى حد ما بنسبة خطأ مطلق مقداره (16.2% ، 8.6%) على التوالي.

Keywords


Article
Optimal Quantitave and Distributive Analysis of Thermal Pollution due to Heated Water Released to Rivers

Authors: Tariq J.Al-Mosewi --- Rafa H.Al-Suhaili
Journal: Iraqi Journal of Chemical and Petroleum Engineering المجلة العراقية للهندسة الكيمياوية وهندسة النفط ISSN: 19974884/E26180707 Year: 2008 Volume: 9 Issue: 2 Pages: 25-41
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

To reduce the effects of discharging heated water disposed into a river flow by a single thermal source, two parameters were changed to get the minimum effect using optimization. The first parameter is to distribute the total flow of the heated water between two disposal points (double source) instead of one and the second is to change the distance between these two points. In order to achieve the solution, a two dimensional numerical model was developed to simulate and predict the changes in temperature distribution in the river due to disposal of the heated water using these two points of disposal. MATLAB-7 software was used to build a program that could solve the governing partial equations of thermal pollution in rivers by using the finite difference technique. The distribution of temperature in the river was presented by using the SURFER software that was used to draw the temperature contour lines and computing the areas of critical temperature (The area where the temperature exceed a certain selected value, which is believed to be critical for aquatic life). The optimum case was that which gave the minimum critical area.The decision variables are the subdivided flow of the two disposal points, and the distance between these two points. The result had indicated that the optimum case can be achieved when the flow of first point was 0.1 from the total flow of heated water and the second was 0.9 from this total flow. The optimal distance between the two points was found to be 30 m.

Keywords


Article
Short Term Forecasting of Sulfate Concentrations in Baghdad

Authors: Shuwan J. I. Barzanjy --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2008 Volume: 14 Issue: 2 Pages: 2430-2441
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Water quality control is an important protection issue. The analysis of the water quality parameters and the prediction of their changes in future, are important in the planning for water pollution control program. This analysis and prediction are the important steps and functions that the environmental engineer must perform.In this study, time series analysis was applied to model a short term forecasting for the minimum and the maximum values for both raw and produced water of Sulfate concentrations at seven water treatment plants serving Baghdad city (Karkh, Sharq Dijlah, Karama, Wathba, Qadisiya, Dora, and Rasheed). Holt-Winters' method was used for the modeling. Three years (2001-2003) were used for building the model and the year (2004) was used for the verification, to check the model acceptability. Comparisons by (t-test) and (F-test) between means and variances of the observed concentrations and these generated by the Holt-Winters' model had reflected the applicability of this model. Hence, in future for operation purposes, it can be use for forecasting Sulfate concentrations.Visual Basic Application (VBA) software was built for this short-term forecasting model. This software was built in away, which allows an automatic updating of the model parameters. Adding additional observed data usually performs the updating of such model.

Keywords


Article
The Migration of Light Organic Liquids in An Unsaturated-Saturated Zone Of The Soil

Authors: Ayad A. Faisal --- Rafa H. Al-Suhaili رافع هاشم السهيلي
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2007 Volume: 13 Issue: 3 Pages: 1649-1664
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

A one-dimensional finite difference model for the simultaneous movement of light non-aqueous phase liquid (LNAPL) and water through unsaturated-saturated zone of the soil in a three fluid phase system with air assumed constant at atmospheric pressure is developed. The flow equations described the motion of light non-aqueous phase liquid and water are cast in terms of the wetting and non-wetting fluid pressure heads respectively. The finite difference equations are solved fully implicitly using Newton-Raphson iteration scheme. The present numerical results are compared with results of Kaluarachchi and Parker (1989) and there is a good agreement between them. The present model can be used to simulate various transport problems in a good manner. Results proved that the maximum LNAPL saturation occurred below the source of the contaminant during LNAPL infiltration. During redistribution, the LNAPL saturation had a maximum value at the advancing of the LNAPL infiltration front.

في هذه الدراسة تم تطوير نموذج عددي ذو بعد واحد يستخدم الفروقات المحددة لوصف حركة الماء والسائل العضوي الأخف منه خلال التربة المشبعة وغير المشبعة مع ثبوت ضغط الهواء عند الضغط الجوي. أن المعادلات التي تصف حركة الماء والسائل العضوي وضعت بدلالة عمود الضغط لتلك السوائل. أن معادلات الفروقات المحددة حلت (fully implicitly) وباستخدام طريقة (Newton-Raphson). تمت عملية اختبار كفاءة النموذج الحالي من خلال مقارنة نتائجه مع نتائج النموذج المقدم من قبلKaluarachchi and Parker (1989). أن النموذج الحالي ممكن آن يستخدم لوصف مختلف المسائل بشكل جيد. أن اكبر تشبع بالملوث يحدث اسفل مصدر التلوث خلال التسرب في حين تكون هذه القيمة في مقدمة جبهة الملوث خلال اعادة التوزيع.


Article
Integrated System for Air Pollution around Refineries

Authors: Muna Samir Al-Khafaji --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2009 Volume: 15 Issue: 4 Pages: 4204-4218
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

A mathematical model for integrated air pollution modelling around refineries is built and named as Computerized System for Integrated Air Pollution Modelling Around Oil Refineries (CSIAPMAOR).The model based on Gaussian equation to estimate concentration of pollutants (SO2, NO2, CO, Particulates) that are emitted from a continuous air pollution elevated source. The model is designed by using Visual Basic as a main core of the system and linked with auxiliary models such as ArcMap (GIS), Surfer software, Ms-Excel and Ms-Access. The model has flexibility to select either rural, urban or stability (Smith equation) wind speed profile. It also has the option of using three types of dispersion coefficients equations for rural condition (PGT-Briggs-Martin equation) and one equation for urban condition (Briggs equation).The model has many options to display results as concentrations versus center line-downwind distance or as Three-Dimensional (3D) map. The model can compute maximum concentration with the contribution of each stack to the overall maximum concentration. Moreover the model has the ability to perform a sensitivity analysis for the effect of the most important parameters according to the Gaussian equation. AL-Doura Oil Refinery was taken as a case study using the available observed data of two sites1 and 2 for periods 15th -21st and 23rd -29th August 1997 in order to check the performance potential of the model. Results showed that Briggs equation for dispersion coefficients with rural wind speed profile has the best degree of agreement with the observed values of 0.86, 0.90 for SO2; 0.69, 0.80 for NO2; 0.73, 0.79 for CO; 0.63, 0.60 for particulates at site 1 and 2 respectively. It is found, that for AL-Doura Oil Refinery stacks number 6, 2, 7, and 3 have a large contribution on the overall maximum concentration. The model demonstrates the influence of atmospheric stability, wind speed, emission rate, exit velocity, physical height, exit temperature and rural-urban area in reducing the concentrations of pollutants. Sensitivity analysis shows that the concentrations are sensitive to stability class in comparison with other input parameters.

في هذا البحث تم بناء نظام مبرمج في الحاسوب لنمذجة متكاملة لتلوث الهواء حول المصافي وسمي ب CSIAPMAOR. النموذج مبني اساسا″على معادله ﮔاوس لتخمين ملوثات الهواء مثل ثنائي اوكسيد الكبريت وثنائي اوكسيد النتروجين واول اوكسيد الكاربون والدقائق العالقه المنبعثة من مصادر تلوث الهواء المستمر . النموذج تم تطويرة باستخدام برنامج Visual Basicكلغة برمجيه اساسيه للنظام مع ربط النظام ببرامج مساعدة وهي: اولا″ برنامج ArcMap(GIS)تم استخدامه لاعطاء احداثيات حقيقية للخارطة الاساسية مع رسم طبقات كنتورية ذات ثلاثة ابعاد TINs. ثانيا" برنامج Surfer وذلك لرسم خرائط كنتورية لتحليل الحساسية . ثالثا" برنامجMs Excel وبرنامجMs Access وذلك لخزن كل مدخلات و نتائج البرنامج. . النموذج ذو قابلية لاختيارواحدة من ثلاث حالات لحساب تغاير سرعة الرياح في المناطق الحضرية او الريفية او بالاعتماد على الاستقرارية (معادله سمث). النموذج ايضا" له القابلية لاختيار واحدة من ثلاث معادلات للمناطق الريفية. والمعادلات هي (PGT – Briggs –(Martin equation و معادله واحدة للمناطق الحضرية(Briggs) لحساب معاملات التشتت . بالاضافة الى امكانية النموذج لعرض نتائج تغير التراكيز مع خط منتصف الدخان المنبعث أو بشكل خارطة ثلاثية الابعاد. بالاضافة الى امكانية النموذج في حساب التركيز الاقصى للملوثات مع تحديد مساهمة كل مصدر من مصادر التلوث في قيمة هذا التركيز كما أن له امكانيه استخدام تحليل الحساسيه لتبيان تأثير تغير المعاملات المهمة على معادلة ﮔاوس. البرنامج يتناول مصفى الدورة كموضوع دراسة باستخدام البيانات المتوفرة التي تمت ملاحظتها لموقعين عند جنوب شرق المصفى للفترتين (15-21) و(23- 29) من اب للعام 1997 . أستخدمت هذة البيانات للتحقق من كفاءة اداء البرنامج .النتائج المستحصلة من استخدام معادلة Briggs لمعاملات التششت مع مؤشرات سرعة الرياح في المناطق الريفية أعطت توافقية عالية مع القيم المقاسة. وقيم معامل التوافق البالغة 0.86 و 0.90 لثنائي اوكسيد الكبريت و 0.69 , 0.80 لثنائي اوكسيد النترجين و0.73 , 0.79 لأول اوكسيد الكربون و 0.63 , 0.60 للدقائق العالقة في الموقعين 1 و 2 على التوالي . وايضا" وجد من خلال تحليل المساهمة بأن ثنائي اوكسيد الكبريت له التركيز الاقصى في الساعة للفترات آنفة الذكر و بذلك يفوق المعايير المسموح بها في العراق لكلا الموقعين. مداخن مصفى الدورة رقم 6 و2 و7 و3 كانت لها مساهمة كبيرة في تكوين التراكيز القصوى. و تم استعرض تأثير كل من استقرارية الجو و سرعة الرياح و معدل و سرعة الانبعاث و ارتفاع المداخن و حرارة الانبعاث و تأثير المناطق الحضرية و الريفية في تخفيض تراكيز الملوثات المنبعثه.


Article
PHYSICAL MODEL OF KEROSENE PLUME MIGRATION IN AN UNSATURATED ZONE OF THE SANDY SOIL
موديل فيزيائي لحركة كتلة النفط الأبيض في المنطقة غير المشبعة من التربة الرملية

Authors: Hussein A. M. Al -Madany --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 1 Pages: 130-141
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Physical model tests were simulated non-aqueous phase liquid (NAPL) spill in two-dimensional domain above the water table. Four laboratory experiments were carried out in the sand-filled tank. The evolution of the plume was observed through the transparent side of this tank and the contaminant front was traced at appropriate intervals. The materials used in these experiments were Al-Najaf sand as a porous medium and kerosene as contaminant. The results of the experiments showed that after kerosene spreading comes to a halt (ceased) in the homogeneous sand, the bulk of this contaminant is contained within a pancake-shaped lens situated on top of the capillary fringe.

لقد تضمن العمل المختبري تمثيل تسرب السائل العضوي الأخف من الماء في الطبقة ذات البعدين فوق مستوى الماء الجوفي. حيث اجريت اربعة تجارب مختبرية في حوض زجاجي صنع لهذا الغرض وملأ بالرمل. ان استخدام الزجاج يوفر الأمكانية المطلوبة لمتابعة تقدم مقدمة الملوث وبالتالي رسم شكلها خلال فترات زمنية مختلفة. لقد تم اختيار تربة مدينة النجف لتمثيل الوسط المسامي في كل التجارب المختبرية الحالية في حين تم اختيار النفط الأبيض لتمثيل السائل العضوي المتسرب إلى ذلك الوسط. أظهرت التجارب المختبرية للترب المتجانسة عند توقف انتشار الملوثات النفطية فان كمية كبيرة من الملوثات سوف تشكل شكلا مفلطحا مستقرا فوق منطقة capillary fringe.

Keywords


Article
Preservation of Required Chlorine Concentration in Baghdad Water Supply Networks using on-Site Chlorine Injection

Authors: Riadh Fadhil Al-Azzawe --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2011 Volume: 17 Issue: 4 Pages: 740-762
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The chlorine concentration variation in Baghdad water networks was studied. The chlorine data were collected from Mayoralty of Baghdad and Ministry of Environment (MOE) for the networks for both sides of the city Karkh and Rasafa for (2008-2009). The study of these data indicates that there are no systematic testing program .Classified GIS maps showed that the areas far from the treatment plants have almost always low chlorine concentration .This indicates that the problem of the low chlorine concentration in the far areas is due to cracks of pipe along the conveyance path ,as expected. The area's most frequently have low concentration are Al-sadir,Al-Kadhimya, and Al-Amiria . It was found also that the chlorine concentrations were lowest in summer months than those in winter months.The Amiria area district (636) was selected as a case study to test the ability of using the quantitative- qualitative model in the EPANET software, to find the required onsite chlorine injection point number, locations and dose, so as to raise the chlorine concentration to the acceptable limits in the other nodes of the network. The bulk decay coefficient was found to be (-2.212)1/day and the wall coefficients were found to be between (-0.001)to(-0.9)1/day The main conclusion of this study is that the onsite injection can improve the chlorine concentration in Baghdad water supply networks. The EPANET model can be used effectively to obtain the required injection program for this purpose.

حفظ تركيز الكلور المطلوب في شبكات مياه الشرب في بغداد بأستعمال حقن الكلور في الموقع .في البحث تم دراسة تلوث المياه في شبكات ماء بغداد من ناحية تركيز الكلور المتبقي فقط. ثم جمع المعلومات والخرائط الخاصة بشبكات المياه ومشاريع التصفية في بغداد من الكرخ والرصافة .كما تم جمع البيانات الخاصة بقياسات تركيز الكلور في تلك الشبكات من الجهات التي لهاعلاقة (وزارة البيئة وأمانة بغداد) وتم توحيدها في نظام المعلومات الجغرافية(GIS). البيانات المتوفرة لسنتين (2008-2009).من خلال دراسة تلك البيانات تبين عدم وجود نظام قياسات متبع لاجراء القياسات في أوقات محددة أو أماكن محددة ,ولكن هناك مبدأ عام هو أن يكون هناك قياس واحد على الاقل شهريا. أما من ناحية الاماكن التي يتم فيها القياس فأن المبدأ العام المتبع من قبل تلك الجهات هو تغطية جانبي الكرخ والرصافة قدر الامكان شهريا.بين التحليل لتلك البيانات والخرائط المنتجة بنظام المعلومات الجغرافية بأن أكثر المناطق تلوثا هي المناطق الواقعة في أطراف المدينة مما يوكد بأن سبب المشكلة هي ما يطرأ من مشاكل على المياه أثناء عملية جريان المياه في الانابيب وكلما زادت المسافة كلما زاد أحتمال التلوث وبالتالي نقصان تركيز الكلور. من تلك المناطق مدينة الصدر ,الكاظمية ,العامرية.كما بين التحليل أن تركيز الكلور في فصل الصيف يكون أقل منه في الشتاء.تم أختيار منطقة العامرية (جزء من الشبكة فيها ) محلة (636) كحالة دراسية لاختبار أمكانية أستخدام نموذج النوعية – الكمية الموجود في برنامج (EPANET) لايجاد نقاط الحقن الموقعي بالكلور وكمية الجرعة بحيث ترفع نسبة الكلور في نقاط تلك الشبكة الى 0,5 ملغم/لتر أو اعلى بقليل.قبل أمكانية تطبيق البرنامج يتطلب حساب معامل التحلل العام (Bulk decay coefficient ) ومعامل التحلل بجدار الانبوب (Wall decay coefficient ) .لحساب المعامل الاول جمعت عينات من الماء تم فحصها باوقات مختلفة لايجاد تغاير تركيز الكلور مع الزمن ومن ثم تم أيجاد المعامل على انه انحدار المنحني (( مع الزمن (t ) وقد كانت قيمته (-2.212 )1 .أما بخصوص حساب معامل التحلل لجدار الانبوب فقد تم أولا أجراء قياسات حقلية لتركيز الكلور في الشبكة المستخدمة كحالة دراسية في 17 نقطة ولمدة (6) أشهر وتم حساب معامل الجدار باستخدام طريقة المحاولة والخطأ بأستخدام البرنامج (EPANET) حيث يضخ البرنامج في نقطة المصدر بالقيمة المقاسة ويحسب بالنقاط الاخرى بأستخدام قيم مفروضة ويتم تعديلها الى ان تتطابق القيم المقاسة مع القيم المحسوبة بالبرنامج .أعتمد مبدأ مجموع مربعات الفروق بين القيم المقاسة والقيم المحسوبة.قد بينت النتائج أن قيم معامل التحلل للجدارتتراوح بين -0.9 to -0.001))day/1.تم تطبيق البرنامج EPANET لايجاد نقاط الضخ الموقعي للكلور على حالة معدل الجريان اليومي وتم استخدام عدة حالات ادرجت منها افضل حالتين .حالة (A)حيث ان نقطة ضخ الكلور الموقعي في نقطة رقم (5) وخلال فترتين في اليوم من الساعة 7-11 صباحا ومن الساعة 4-8 مساءا وبجرعة (1.5 ) ملغم/لتر .أما الحالة (B) بنفس النقطة ونفس الفترة ولكن بجرعة قدرها (0.8) ملغم/لتر. أظهرت النتائج بأن الحالة ( A ) هي الافضل لكونها ترفع تركيز في تلك الفترات في النقاط المختلفة للشبكة الى قيمة تقع ضمن الحدود المقبولة لتركيز الكلور وهي (0.5-2 ) ملغم/لتر.ولكن يجب الاشارة الى انه أن كان هناك تلوث كبير في الشبكة الحالة (A)هي المفضلة أما في حالة التلوث القليل فأن الحالة ( B ) هي الافضل.

Keywords

Water --- Supply --- Network --- EPANET --- Geographical --- Information --- System --- Sectoral --- Chlorine --- Injection


Article
Building of an Expert System for WWTP Operation and Management: Rustimiyah South WWTP as a case-study

Authors: Bashar J. Khalaf Al-Daami --- Rafa H. Al-Suhaili
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2010 Volume: 16 Issue: 2 Pages: 5021 -5032
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This paper presents the building of expert system to enable the inexperience plants operators to application of better of wastewater treatment plant. This methodology consists of three steps: (i) creation of a decision trees (algorithms) for the diagnosis operational problems; (ii) implementation into a real-based system; and (iii) verification. This system called expert system for Rustimiyah south wastewater treatment plant operation (ES-RS-WWTPO). The knowledge acquisitions to build this system ware extracted from literature. Moreover local experience ware also incorporated using the results of a well designed questionnaire. The results obtained in the application three operational states showed that the system was able to diagnosis (correctly) state of plant with reasonable accuracy. The programmer language for built this system id Visual Basic 6.0.

Keywords

Listing 1 - 10 of 16 << page
of 2
>>
Sort by
Narrow your search

Resource type

article (16)


Language

English (16)


Year
From To Submit

2017 (1)

2015 (1)

2014 (2)

2013 (1)

2011 (2)

More...