research centers


Search results: Found 2

Listing 1 - 2 of 2
Sort by

Article
Evaluate the implementation of the investment plan projects A study on the field of the plan projects for the period 2013-2016
تقييم تنفيذ مشاريع الخطة الاستثمارية دراسة ميدانية لمشاريع الخطة للمدة 2013-2016

Authors: عبد السلام لفتة --- احمد وليد احمد
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2018 Volume: 24 Issue: 107 Pages: 1-23
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Abstract:The main problem of this research is the delay of implementation of the investment plan projects for the period (2013-2016) and the weakness of the staff ability in the ministries and they don’t have the sufficient experience to carry out the implementation process.Therefore, the research aims to evaluate the implementation of programs and projects of the investment plan in a manner consistent with the objectives set for them without any wasteful of efforts, time and money. And then identify the problems and obstacles to determine the deviations of the implementation of the specific for each sector according to the criteria of evaluation and the form of cost, quality, time and implementation.And on the premise that the use of criteria for evaluation of the implementation of investment projects through the analysis of problems and obstacles encountered in the field will lead to the results are close to reality and provide a high degree of confidence in making corrective decisions for the stage of implementation of projects and avoid falling into the same mistakes when taking Future investment decisions.The research is based on the analytical field study of indicators of implementation of investment plan projects in the Iraqi Ministry of Planning for the period (2013-2016) Through it reached several conclusions, the most important of them is the weakness of the efficiency of contractors and contractors companies by using determinants of projects to use criteria for evaluation, while not following the scientific basis for setting these determinants,The recommendations of the research are the necessary possibilities and recommendations to solve the problems that were the cause of low rates of financial and material implementation and the emergence and increasing of problems.

مستخلص البحث:تكمن مشكلة البحث في تلكؤ تنفيذ مشاريع الخطة الاستثمارية للأعوام (2013-2016) وضعف إمكانات العاملين في الوزارات وعدم امتلاكها الخبرة الكافية للقيام بعملية التنفيذ . وعلى ذلك يهدف البحث الى تقييم عملية تنفيذ البرامج والمشاريع للخطة الاستثمارية بالشكل الذي ينسجم مع الأهداف المحددة لها دونما إسراف أو تبذير في الجهد والوقت والمال، ثم تحديد المشاكل والمعوقات لها لتحديد أنحرافات التنفيذ عن المحدد لكل قطاع على وفق معايير التقييم والمتمثلة بـ( الكلفة والجودة والوقت والتنفيذ ) و على فرضية مفادها استخدام معايير خاصة بتقييم تنفيذ المشاريع الاستثمارية من خلال تحليل المشاكل والمعوقات التي تواجهها ميدانيا سيؤدي إلى التوصل إلى نتائج تكون قريبة من الواقع وتوفر درجة عالية من الثقة في اتخاذ القرارات التصحيحية لمرحلة تنفيذ المشاريع وتجنب الوقوع في نفس المثالب عند اتخاذ القرارات الاستثمارية المستقبلية. يستند البحث إلى الدراسة الميدانية التحليلية لمؤشرات تنفيذ مشاريع الخطة الاستثمارية في وزارة التخطيط العراقية ، للفترة من 2013 إلى 2016م. والتي من خلالها توصل لعدة أستنتاجات اهمها ضعف كفاءة الجهات والشركات المقاولة باستخدام محددات للمشاريع لأستخدامها معايير للتقييم مع عدم أتباع الاسس العلمية لوضع هذهِ المحددات و تخوض توصيات البحث في الامكانيات والمقترحات الضرورية لحل المشاكل التي كانت سبباً وراء تدني نسب التنفيذ المالي والمادي وظهور المشكلات وأتساعها


Article
Strategic Analysis of the Reasons for the Delay of the Investment Projects of the North Oil Company / Case Study
التحليل الاستراتيجي لأسباب تلكؤ مشاريع الخطة الاستثمارية لشركة نفط الشمال وعلى وفق مصفوفة SWOT / دراسة حالة

Authors: abidalsalam l s عبد السلام لفته سعيد --- shaimaa a.m شيماء عبد الكريم محي الدين
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2019 Volume: 25 Issue: 115 Pages: 1-27
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The research aims to find a contemporary model in analyzing the reasons behind the delay of the investment plan projects suffered by the North Oil Company. This model is able to understand the environment surrounding the implementation of projects in the light of the changes facing the company at the present time, which in turn requires the need to identify the most important strengths and weaknesses Internal and external opportunities and threats using the SWOT matrix and identify the appropriate strategic alternative based on clear policy, strategies and programs to address weaknesses and look to the future prospects as the company can be stronger and more flexible environmental changes surrounding the reality of implementation Investment plan projects, because the strategic analysis is the best way out of the stalemate and stability to the circle of innovation and creativity, the implementation of those projects of importance in the economic development of the country. The research community of the investment projects of the North Oil Company and approved by the Ministry during the period (2013-2017), the number of projects (279) projects distributed on (11) major project, and classified into completed projects and by (5.7%) This is indicative of a high degree of delay and delay in the implementation of the projects of the company's investment plan (94.3%). It was concluded that the process of strategic analysis is an important step for the company to detect the internal and external environment to address the current and future weaknesses and threats to the projects and a good way to draw the factors of success and the formulation of programs and strategies as a preventive and remedial, and that internal weaknesses are affecting the completion of the investment plan projects of the company, Therefore, the researcher recommended the adoption of the proposed program in the current study, directed at the internal and external environment, in order to achieve the goals and objectives through the development of fields and expand the performance of production facilities and increase production capacity and For the export of crude oil and gas to the company.

يهدف البحث الى إيجاد أنموذج معاصر في تحليل أسباب تلكؤ مشاريع الخطة الاستثمارية الذي تعاني منه شركة نفط الشمال, يتسم هذا الانموذج بقدرته على فهم البيئة المحيطة بتنفيذ المشاريع في ضوء التغييرات التي تواجهها الشركة في الوقت الحالي، وهذا بدوره يتطلب الحاجة إلى تحديد أهم نقاط القوة والضعف الداخلية والفرص والتهديدات الخارجية باستعمال مصفوفة (SWOT) وتحديد البديل الاستراتيجي المناسب على وفق سياسة واضحة واستراتيجيات وبرامج مناسبة لمعالجة نقاط الضعف والتطلع إلى آفاق المستقبل إذ يمكن للشركة أن تكون أقوى وأكثر مرونة للتغييرات البيئية المحيطة لواقع تنفيذ مشاريع الخطة الاستثمارية, كوّن التحليل الاستراتيجي هو أفضل طريقة للخروج من الجمود والاستقرار إلى دائرة التجديد والإبداع, لما لتنفيذ تلك المشاريع من أهمية في تحقيق التنمية الاقتصادية للبلد، ويمثل مجتمع البحث بالمشاريع الاستثمارية لشركة نفط الشمال والمصادق عليها من قبل الوزارة خلال المدة (2013-2017م)، إذ بلغ عدد المشاريع (279) مشروعاً موزعاً على (11) مشروع رئيسي, وتم تصنيفها الى مشاريع منجزة وبنسبة (5,7%) وهي نسبة ضئيلة جداً, وهذا مؤشر على وجود درجة عالية من التلكؤ والتأخر في تنفيذ مشاريع الخطة الاستثمارية للشركة وبنسبة (94,3%). تم التوصل الى أن عملية التحليل الاستراتيجي تعد خطوة مهمة للشـركة للكشف عن البيئة الداخلية والخارجية لمواجهة الضعف والتهديدات الحالية والمستقبلية التي تتعـرض لهـا المشاريع وطريقة جيدة لرسم عوامل النجاح وصياغة برامج واستراتيجيات كوسـيلة وقائيـة وعلاجية, وان نقاط الضعف الداخلي هي المؤثرة في انجاز مشاريع الخطة الاستثمارية للشركة, لذلك اوصى الباحث باعتماد البرنامج المقترح في الدراسة الحالية, والموجه للبيئة الداخلية والخارجية, بغية الوصول إلى الغايات والاهداف المرجوة من خلال تطوير الحقول وتوسيع ادائية مرافق الانتاج وزيادة الطاقة الانتاجية والتصديرية للنفط الخام والغاز للشركة.

Listing 1 - 2 of 2
Sort by
Narrow your search

Resource type

article (2)


Language

Arabic and English (2)


Year
From To Submit

2019 (1)

2018 (1)