research centers


Search results: Found 24

Listing 1 - 10 of 24 << page
of 3
>>
Sort by

Article
Handoff Priority Schemes in Wireless Mobile Cellular System
أولويات طرق المناقلة لنظام لاسلكي خلوي متنقل

Authors: H. A. Al-Tayyar هدى عقيل الطيار --- S. A. Mawjoud سامي عبد الموجود
Journal: AL-Rafdain Engineering Journal (AREJ) مجلة هندسة الرافدين ISSN: 18130526 Year: 2010 Volume: 18 Issue: 6 Pages: 54-60
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

AbstractHandoff operation, algorithm and modeling is vital in wireless cellular system. Two fundamental handoff procedures exist. The first model concerning the propagation environment and the second model is the limited channel resources which is dealt with in this paper. A realistic model of guard channel priority representing mobility is suggested and simulated. Keywords: Wireless network, Handoff priority schemes.

المستخلصإن خوارزمية ونمذجة عملية المناقلة هي من الأولويات لنظم الاتصالات اللاسلكية. هنالك طريقتان أساسيتان للمناقلة. النموذج الأول يخص ظروف الانتشار والنموذج الثاني هو مصادر القنوات المحدودة والنموذج الثاني الذي تم التعامل معه في هذا البحث وتم اقتراح نموذج واقعي يتضمن مصادر القنوات المحددة والذي يمثل حالة الحركة الواقعية في الخلايا ومن ثم محاكاة هذا النموذج ودراسة خواصه.


Article
A Proposed Artificial Intelligence Algorithm for Assessing of Risk Priority for Medical Equipment in Iraqi Hospital
مقترح خوارزمية لتقنية الذكاء الاصطناعي لتقييم اولويات الخطورة للاجهزة والمعدات الطبية في المستشفيات العراقية

Loading...
Loading...
Abstract

This paper presents a robust algorithm for the assessment of risk priority for medical equipment based on the calculation of static and dynamic risk factors and Kohnen Self Organization Maps (SOM). Four risk parameters have been calculated for 345 medical devices in two general hospitals in Baghdad. Static risk factor components (equipment function and physical risk) and dynamics risk components (maintenance requirements and risk points) have been calculated. These risk components are used as an input to the unsupervised Kohonen self organization maps. The accuracy of the network was found to be equal to 98% for the proposed system. We conclude that the proposed model gives fast and accurate assessment for risk priority and it works as promising tool for risk factor assessment for the service departments in large hospitals in Iraq.

يقدم البحث خوارزمية لتقييم اولويات الخطورة للاجهزة و المعدات الطبية في المستشفيات العراقية معتمدا على حساب عوامل الخطورة الساكنة والديناميكية وخرائط كوهونين ذاتية التنظيم. تم حساب اربع متغيرات خطورة ل 345 جهاز طبي مختلف. تم اخذ هذه العينات من مستشفى اليرموك التعليمي و مستشفى الشهيد عدنان للجراحات التخصصية في بغداد. تم حساب مكونات الخطورة الاستاتيكية (وظيفة الجهاز و الخطورة المادية ) و مكونات الخطورة الديناميكية ( متطلبات الصيانة و نقاط الخطورة ). هذه المكونات استعملت كمدخلات للشبكة العصيبية وهي من نوع خرائط كوهونيين الذاتية التنظيم. لاختبار كفاءة الخوارزمية، تم حساب نسبة التمييز للشبكة ووجد انه 98% ومن هذا البحث نستنتج النظام المقترح يعطي تقييم سريع ودقيق لاولوية الخطورة و يعمل كأداة واعدة لتقييم عامل الخطورة في اقسام الصيانة في المستشفيات الكبيرة في العراق.


Article
A Modified for Largest Processing Time Scheduling Algorithm in Multiprocessor
تطوير خوارزمية جدولة زمن التنفيذ الأكبر في المعالجات المتعددة

Author: Isra Natheer Alkallak إسراء نذير الكلاك
Journal: Tikrit Journal of Pure Science مجلة تكريت للعلوم الصرفة ISSN: 18131662 Year: 2011 Volume: 16 Issue: 4 Pages: 280-283
Publisher: Tikrit University جامعة تكريت

Loading...
Loading...
Abstract

The research reviewed new priority allocated to the independent tasks in the graph in the modified algorithm for largest processing time scheduling algorithm in multiprocessor. Schedule length was taken criterion in determining the efficiency of the algorithm. The priority was calculated from the proportion of task's execution time to the total execution time for all tasks in the graph and then arranged in descending order. Practical side was simulated by computer program in Visual Basic 6 language. A modified algorithm is more efficient than shortest processing time scheduling algorithm. In practical side confirmed efficiency of modified algorithm by selecting free of first task from set of tasks in graph through scheduling.

استعرض البحث أسبقية جديدة تُخصص للعمليات المستقلة في البيان لغرض تنفيذها على معالجين في خوارزمية مطورة لخوارزمية جدولة زمن التنفيذ الأكبر في المعالجات المتعددة. اُتخذ طول الجدولة معياراً في تحديد كفاءة الخوارزمية المطورة. تم حساب الأسبقية من نسبة زمن تنفيذ العملية إلى الزمن الكلي للعمليات جميعها في البيان ومن ثم ترتب تنازلياً. تم محاكاة الجانب العملي بشكل برنامج حاسوبي بلغة فيجول بيسك6. تبين إن نتائج تطوير الخوارزمية المذكورة أكفأ من خوارزمية زمن التنفيذ الأصغر، في حين أثبت الجانب العملي كفاءة الخوارزمية المطورة في حرية اختيار العملية الاولى من بين العمليات في البيان أثناء الجدولة.


Article
Refine Priority Queuing Scheduling Algorithm By Applying Time Expired Packets Algorithm
تحسين أداء خوارزمية الجدولة حسب الأسبقية عن طريق تطبيق خوارزمية إهمال الحزم المنتهية الصلاحية

Authors: Dr. Mohammed B. Abdullah د.محمد بشير عبدالل --- YazenS.Sheet يزن صبحي شيت
Journal: AL-Rafdain Engineering Journal (AREJ) مجلة هندسة الرافدين ISSN: 18130526 Year: 2012 Volume: 20 Issue: 2 Pages: 150-163
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

AbstractQuality of service (QoS) is a corner stone in recent Internet applications. One of the requirements of achieving QoS in routers is scheduling algorithms. Priority Queuing (PQ) is the simplest most used scheduling algorithm. This algorithm may cause starvation in less priority queues. Time Expired (TE) algorithm is a refine of PQ which discards packets that would reach the receiver out of time. Thus improving throughput and delay for less priority queues with the discard of retarded usefulpackets in time sensitive – loss tolerant Internet applications. A simulation study using OPNET Modeler is carried out. The results show a 20% improvement in throughput of less priority applications. The delay performance is improved for all applications by a factor of 4% to 42% Keywords: QoS, Scheduling Algorithms, Priority Queuing Algorithm,OPNET

الخلاصةتعتبر جودة الخدمة حجر الزاوية في التطبيقات الحالية لشبكة الانترنيت. ومن متطلبات تحقيق جودة الخدمة تطبيق خوارزميات الجدولة في الموجهات. من أسهل هذه الخوارزميات وأكثرها استخداما خوارزمية الجدولة حسب الأسبقية ولكن قد يسبب تطبيق هذه الخوارزمية انحسارا في خدمة التطبيقات ذات الأسبقيات الاوطأ. اقترحت خوارزمية انتهاء الصلاحية لغرض التقليل من مساوئ خوارزمية الجدولة حسب الأسبقية على خدمة التطبيقات ذات الأسبقيات الاوطأ حيث تقوم الخوارزمية المقترحة بإهمال الحزم التي يتطلب وصولها إلى المستلم وقتا يتجاوز الوقت الذي تكون فيه مفيدة. وبهذا تم تحسين معدل الاستلام وزمن التأخير لبقية التطبيقات من خلال إهمال هذه الحزم المتأخرة من التطبيقات(الحساسة للزمن والقابلة للفقد) والتي يعتبر إرسالها غير مجدي عبر الشبكة. تمت محاكاة عمل الخوارزميتين باستخدام برنامج (OPNET Modeler) ولوحظ من خلال النتائج أن هناك تحسن في معدل الاستلام لبقية التطبيقات بمقدار 20% في حين أن زمن التأخير قد تحسن لجميع التطبيقات بنسبة 4% إلى 42%


Article
التحديات الدولية لتمويل الموازنة العامة في العراق بعد عام 2003

Authors: م.د.ستار جابر عمران --- م.د.يوسف عبدالله عبد
Journal: AL-Mostansiriyah journal for arab and international studies مجلة مركز المستنصرية للدراسات العربية والدولية ISSN: 2070898X Year: 2014 Issue: 47 Pages: 70-102
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

The Importance of this paper takes its Priority from the Challenge and risks that influence the finance system of the budget in Iraq in the next year according to some international economic variables which come up from the advances of a new economic stage which may affect directly or indirectly in the Size of the Public revenue.The paper show that the oil revenue plays an essential role (main source) in financing Public budget and less contribution of other kinds of revenue which cannot be an alternative for the oil revenue in vision future – meaning that the budget financing will expose to International risk & challenges such as changes in oil prices, the increasing of integration trade; WTO, and technological progress, and e-commerce; FDI and crisis, International taxes phenomenon which have a negative effect upon the Budget because it leads to decreasing in Taxes revenue and the later in nation the role of other revenue in financing the budget inside Iraq because of the limited contribution of the private sector in economic activity and decreasing of the amount of retain (Cutting) in less utility advanced to beneficiary.There are several methods to overcome these International Challenges and prevent their dangerous and find effective sources of revenue contribute in financing budget and decreasing the dependency on oil revenue which include: creating effectiveness internal revenue such as taxes revenue and non-taxation and sovereign wealth boxes.

يكتسب ﻤﻭﻀﻭﻉ البحث اهميته لما ﻴﺤﻤﻠﻪ ﻤﻥ مخاطر وتحديات قد يتعرض لها نظام تمويل الموازنة في العراق مستقبلاً استناداً لمجموعة من المتغيرات الاقتصادية الدولية التي افرزتها تطورات مرحلة اقتصادية جديدة يمكن أن تؤثر بشكل مباشر أو غير مباشر في حجم ﺍﻹﻴﺭﺍﺩﺍﺕ ﺍﻟﻌﺎﻤﺔ.اظهر البحث اعتماد العراق مساهمة ايرادات النفط بوصفها مصدراً رئيساً في تمويل الموازنة مع مساهمة محدودة لبقية انواع الايرادات لا يمكن ان تكون بديلا عن ايرادات النفط في المستقبل المنظور، مما يعني تعرض تمويل الموازنة لمخاطر وتحديات دولية عدة منها تغير اسعار النفط وتنامي ظاهرة التكتلات التجارية ومنظمة (WTO) والتطورات التقنية والتجارة الالكترونية والاستثمار الاجنبي والازمات الاقتصادية والظواهر الضريبية الدولية والتي سيكون تأثيرها سلبياً في الموازنة لكونه يؤدي الى انخفاض الايرادات الضريبية وتراجع دور الايرادات الاخرى في تمويل الموازنة في الداخل بسبب محدودية مساهمة القطاع الخاص في النشاط الاقتصادي وانخفاض مقدار الاقتطاع باقل من المنفعة المقدمة للمستفيد.هناك سبل عدة لتجاوز تلك التحديات الدولية والحد من مخاطرها وايجاد مصادر ايرادية فاعلة تسهم في تمويل الموازنة وتقليل اعتماد ايرادات النفط في التمويل تتضمن تفعيل مصادر ايرادات داخلية منها الايرادات الضريبية وغير الضريبية وصناديق الثروة السيادية.


Article
Prioritizing of Risk Factors by using Failure Mode and Effect Analysis in the Iraqi Construction Industry

Authors: Hatim A. Rashid --- Mohammed k. AL- Mhdawi
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2016 Volume: 34 Issue: 7 Part (A) Engineering Pages: 1369-1382
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The main aim of the study is to demonstrate the qualitative risk analysis method by using failure mode and effect analysis (FMEA) in the construction industry in Iraq .The questionnaires considered as an important method of gathering field information about the risk management in the Iraqi construction industry .The numbers of the questionnaire forms which was distributed between the private and state sectors were 75 forms which consider the sample size. Atotal numbers of 69 forms from the distributed formswere returned with a returning percentage of (92%). Results show that 21.15% of the the risk factors are categorized as a Low risks. Also, a percentage of 44.23% shows that gathered risks factors of the construction projects are categorized as Moderate risks while a percentage of 21.15% are classified as major risk factors .Also, a percentage of 13.46% are classified as significant risk factors .Extreme risk factors are found to be only 0% from the data obtained by analyzing the questionnaire results.


Article
Towards Clouds M-Commerce with Priority Based Resources Allocation (CMPRA) Algorithm

Authors: Nada M. Al-Hakkak --- Nawal A. Ibrahim Al-Jarah
Journal: Journal of Baghdad College of Economic sciences University مجلة كلية بغداد للعلوم الاقتصادية الجامعة ISSN: 2072778X Year: 2015 Volume: 2015 Issue: 6 Pages: 513-526
Publisher: Baghdad College of Economic Sciences كلية بغداد للعلوم الاقتصادية

Loading...
Loading...
Abstract

Cloud computing is one of the popular topics on information technology like E-commerce; which is affected by the use of cloud computing as a communication network tool. Cloud resources should be available for rent by its users; this could be achieved by resource allocation strategies. This work presented the integration between our previous e-business multilayer structure and clouds with resources allocation priority algorithm; in Cloud M-commerce Priority Resource Allocation (CMPRA) algorithm

الحوسبة السحابية من المواضيع الحديثة في تكنولوجيا المعلومات، ويمكن استخدامها كوسيلة اتصال في بيئة الاعمال الالكترونية. بشكل عام توفر الحوسبة السحابية امكانية استئجار مصادر من قبل مستخدميها. ولذلك يجب ان توفر صفة الاتاحية لهذه المصادر وبمرونة عالية. ولتحقيق ذلك يجب استخدام خوارزميات تتيح امكانية تخصيص المصادر وبشكل كفوء لارضاء كافة مستخدمي الشبكة. هذا العمل يقدم تطوير لفكرة بيئة اعمال الكترونية تم اقتراحها مسبقا من خلال ربطها مع الحوسبة السحابية مع امكانية تخصيص المصادر التي يتم طلبها او استئجارها من قبل مستخدمي الشبكة و ذلك من خلال خوارزمية CMPRA.


Article
PWRR Algorithm for Video Streaming Process Using Fog Computing
خوارزمية الجدولة (PWRR) لمعالجة تدفق الفديو باستخدام حوسبة الضباب

Authors: Saba Fouad Hassan صبا فؤاد حسن --- Rana Fareed Ghani رنا فريد غني
Journal: Baghdad Science Journal مجلة بغداد للعلوم ISSN: 20788665 24117986 Year: 2019 Volume: 16 Issue: 3 Pages: 667-676
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

The most popular medium that being used by people on the internet nowadays is video streaming. Nevertheless, streaming a video consumes much of the internet traffics. The massive quantity of internet usage goes for video streaming that disburses nearly 70% of the internet. Some constraints of interactive media might be detached; such as augmented bandwidth usage and lateness. The need for real-time transmission of video streaming while live leads to employing of Fog computing technologies which is an intermediary layer between the cloud and end user. The latter technology has been introduced to alleviate those problems by providing high real-time response and computational resources near to the client at the network boundary. The present research paper proposes priority weighted round robin (PWRR) algorithm for streaming operations scheduling in the fog architecture. This will give preemptive for streaming live video request to be delivered in a very short response time and real-time communication. The results of experimenting the PWRR in the proposed architecture display a minimize latency and good quality of live video requests which has been achieved with bandwidth changes as well as meeting all other clients requests at the same time

يُعد بث الفيديو أكثر الوسائط شيوعًا التي يستخدمها الأشخاص على الإنترنت اليوم ويستهلك الكثير من عمليات نقل الإنترنت. يتم استخدام كمية هائلة من استخدام الإنترنت لتدفق الفيديو الذي ينفق ما يقرب من 70٪ من الإنترنت اليوم. ومع ذلك ، توجد قيود على الوسائط التفاعلية ممثلة في زيادة استخدام النطاق الترددي وتأخره ، مثل بث الفيديو المباشر الذي يتطلب الإرسال في الوقت الفعلي. تستخدم تقنيات حوسبة الضباب للتخفيف من حدة هذه المشكلات من خلال توفير استجابة عالية في الوقت الحقيقي وموارد حاسوبية قريبة من العميل عند حدود الشبكة ، والضباب عبارة عن طبقة وسيطة بين السحابة والمستخدم النهائي ، تقترح هذه الورقة خوارزمية Weighted Round Robin (PWRR) ذات الأولوية لجدولة عمليات التدفق في بنية الضباب لإعطاء استباقية لبث طلب فيديو مباشر لتقديم وقت استجابة أقل للغاية وتواصل في الوقت الفعلي. تعرض نتائج تجربة PWRR في البنية المقترحة لتدفق الفيديوعبر حوسبة الضباب ، تقليل وقت الاستجابة ونوعية جيدة لطلبات الفيديو المباشرة التي تم تحقيقها مع تغييرات النطاق الترددي بالاضافة الى تلبية كل طلبات الاخرى للزبائن في نفس الوقت.


Article
Developing Multistage Heuristic Algorithm To Minimize Idle Time And Makespan In Job Shop Scheduling
بناء خوارزمية توجيهية متعددة المراحل لتدنية الوقت العاطل ووقت الأنهاء الأكبر في جدولة الأنتاج الوظيفي

Author: Mahmoud Abbas Mahmoud
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2010 Volume: 28 Issue: 14 Pages: 4789-4805
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The behavior and performance of job shops have been the focus andattention in both operations research and operations management literature. Job shop scheduling has received this large amount of attention, because it has the potential to dramatically decrease costs and increase throughput, thereby, profits. Moreover, the increasing of product customization creates more job shop environment in manufacturing world. No doubt, a wide variety of approaches tothe modeling and solution of job shop scheduling problems have been reported in the literature. But, the research in this area is continuous. In this paper, Multistage Heuristic Algorithm based on priority dispatching rules is developed. This algorithm has been implemented to solve three cases. Schedules generated havebeen compared with those obtained by means of the basic algorithm. As a result, Multistage Heuristic Algorithm shows the ability of minimizing: machines idle time, total time of machines and makespan.

لقد لقى موضوع طبيعة وأداء نظم الانتاج الوظيفي اهتماما ملحوظا في أدبياتموضوعي بحوث العمليات وادارة العمليات على السواء. و يعودالسبب في هذا الحجم الواسع من الاهتمام بجدولة العمليات في نظم الانتاج الوظيفي لما لهذا الموضوع من أثر كبير في خفض الكلفة وزيادة الأنجاز وبالتالي زيادة الربح. اضافة لما ورد فان الازدياد بالتوجه نحو الانتاج التخصصي قد ادى الى توسع مساحة بيئة الانتاج الوظيفي في عالم التصنيع. لاشك بأنه يوجد في الأدبيات تنوعا واسعا في اساليب النمذجة والحل لمشكلة الجدولة هذه ولكن البحث في هذاالمجال مازال مستمرا. في هذه الورقة تم بناء خوارزمية توجيهية متعددة المراحل مبنية على قواعد الاسبقيات في التقديم. هذه الخوارزمية قد طبقت في حل ثلاث حالات وتم مقارنة الجدولة الناتجة لكل حالة مع تلك الناتجة من تطبيق الخوارزمية الاساسية. وقد اوضحت النتائج بان الخوارزمية الجديدة ادت الى تقليل الوقت العاطل والوقت الكلي للمكائن وكذلك وقت الأنهاء الأكبر.


Article
Heuristic Dispatching Rules for Dynamic Scheduling of Heavy Engineering Equipments
الجدولة الديناميكية للمعدات الهندسية الثقيلة باستخدام قواعد التوزيع الاسترشادية

Authors: Luma Adnan Al-Kindi --- Sawsan Sabeeh Al-Zubaidy --- Alla Eldin H. Kassam
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2012 Volume: 30 Issue: 7 Pages: 1154-1173
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

Dynamic scheduling problem has been an attractive area for researches toinvestigate since a long time. Many techniques have been used to tackle such problems, but all of these techniques require high efforts to formulate the dynamic scheduling problems inorder to obtain optimal solution. Using Heuristic or dispatching rules to solve the dynamic scheduling problem is efficient and popular manner to reach an acceptable level of scheduling. In this paper hybrid techniquesare used in the proposed developed model. First the switching of four dispatching rules (Earliest Due Date (EDD), Slack Time (SLACK), Slack / Remaining Operations (S/ROP) and Priority Index) with the aim of choosing minimum tardy jobs. Second, scheduling-rescheduling approach is used to tackle the dynamic environment of job-shop problem depending on three level algorithms. Third, proposing three level algorithms, these levels are resource level, process planning level to improve scheduling with the aim of minimizing tardy jobs and shorten"order-to-delivery", and job level to design rescheduling policy depending on identified factors of each job order. The developed model is applied to real data from the Heavy Engineering Equipment State Company/Baghdad, and considerable advantages are observed. Applying the proposed model lead to zero number of tardy jobs (NT) and zero mean tardiness (MT). It is obvious from the obtained results that by adopting such model, a better solution for job orders' due dates can be achieved; hence "order-to-delivery" time can be shortened

تعتبر مشكلة الجدولة الديناميكية من المجالات التي تتطلب البحث المستمر وتستهوي الباحثين ومنذ فترة زمنية طويلة. لقد تم استخدام عدد كبير من التقنيات لحل مشكلة الجدولة الديناميكية، والتي تطلبت جهود كبيرة في الصياغة الرياضية للمشكلة بهدف الوصول الى الحل الامثل. ان استخدام قواعد التوزيع الاسترشادية لحل مشكلة الجدولة الديناميكية يعتبر من الوسائل الفعالة والكفوءة للوصول الى المستوي المرضي للحل. تم في هذا البحث اقتراح نموذج مطور باستخدام تقنيات مختلطة. اولا التبادلية بين اربع قواعد توزيع استرشادية هي (اقرب موعد مطلوب للانجاز، الوقت الضائع، الوقت الضائع مقسوما على عدد الفعاليات المتبقية وقاعدة تسلسل الاسبقيات) بهدف الوصول الى اقل عدد من اوامر العمل المتأخرة. ثانيا استخدام الجدولة واعادة (job-shop الجدولة للتعامل مع البيئة الديناميكية لمشكلة الانتاج حسب الطلبباعتماد خوارزمية بثلاث مستويات. ثالثا اقتراح خوارزمية بثلاث مستويات المستوى problem) الاول الموارد، المستوى الثاني تخطيط العمليات لتطوير الجدولة بهدف تقليل اوامر العمل المتأخرة وتقليص دورة (الامر الى التسليم)، ومستوى الاعمال لتصميم سياسة لاعادة الجدولة باعتماد عوامل معرفة لكل امر عمل. تم تطبيق النموذج المطور باعتماد بيانات حقيقة من الشركة العامة للمعدات الهندسية الثقيلة/ بغداد، وتم الحصول على نتائج جيدة ومهمة. حيث انتطبيق النموذج المقترح ادى الى الوصول الى (صفر) من اوامر العمل المتأخرة، وبالتالي (صفر) لمعدل التأخير. نستنج من ذلك انه بتطبيق النموذج المقترح المطور فان الحل يتحسن بخصوص تحقيق مواعيد الانجاز لاوامر العمل وتقليص دورة (الامر الى التسليم).

Listing 1 - 10 of 24 << page
of 3
>>
Sort by
Narrow your search

Resource type

article (24)


Language

English (13)

Arabic (8)

Arabic and English (2)


Year
From To Submit

2019 (4)

2018 (1)

2017 (4)

2016 (1)

2015 (3)

More...