Numerical Modeling of Pore Water Pressure Development in Mosul Dam
دراسة نظرية لضغط ماء المسام المتولد في لباب سد الموصل

Authors: Suhail A. A. Khattab --- Amina A. Khalil
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2013 Volume: 31 Issue: 4 Part (A) Engineering Pages: 618-631
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

A finite element method is useful tools to be applicable in many geotechnical engineering topics. In this paper the pore water pressure development within the clay core of MOSUL earth dam were investigate considering the saturated/unsaturated conditions using GEO-SLOP software. Three selected sections through the dam were chosen for the analysis ( in the middle, right, and left sides of the dam to cover the dam body). The investigation of the dam body response to the earthquakes with many values of the maximum horizontal acceleration was done. Normal, maximum, and minimum operation water levels with possibility of rapid drawdown of water level during (8,21,30) days were also consider. Transient and steady state analysis of pore water pressure was performed, finally the results were compared with the actual field data.Results indicated that, the maximum pore water pressure was occurred for the nodes in the upstream near of the core base at the time during and after the end of earthquake shaking. The results of the study also presented a positive pore water pressure development in the lower part of the core when the water was at maximum, normal, and minimum operation levels, with negative values near the crest of the dam. high pore water pressure was record through sec6 and sec4, for the rapid drawdown of water level at time 8 days. Finally, nearly identical pore water pressure results are obtained from the numerical analysis and the recorded field piezometers readings data.

تعد طريقة العناصر المحددة من الطرق العملية القابلة للتطبيق في العديد من مواضيع هندسة الجيوتكنك. في هذا البحث تم دراسة حالات مختلفة لضغط ماء المسام المتولد في لباب سد الموصل الواقع شمال مدينة الموصل/ العراق. وبثلاث مقاطع مختلفة تم اختيارها في مواقع مختلفة لأجل تغطية جميع أجزاء جسم السد. تم دراسة ثلاث حالات لمستوى الخزن مع احتمالية حدوث تفريغ اضطراري لمستوى الماء في بحيرة السد للفترات (8, 30,21) أيــــام محتمل حصولـــــــــــه نتيجة استقرار جسم السد على صخور جبسية قابلة للذوبان. استخدم برنامج GEO-SLOP OFFECE في التحليل مع الأخذ بنظر الاعتبار الحالة المشبعة / غير المشبعة للتربة في التحليل. أظهرت نتائج التحليل إن قيم ضغط ماء المسام المتولد في لباب السد عند منسوب الماء الاعتيادي الموجود حاليا مقاربة للقيم الحقيقية المأخوذة من قراءات البيزومترات الموزعة على جسم السد. كما تم تسجيل قيم عالية لضغط ماء المسام لحالات التفريغ الاضطراري لحالة 8 أيام أكثر من الحالتين30,21 يوم وخلال المقطعين الأول والثاني (sec6, sec4) المختارين أكثر من المقطع الثالث ( sec2).


Article
Stability Analysis of MOSUL Dam under Saturated and Unsaturated Soil Conditions
تحليل استقرارية سد الموصل لحالتي التربة المشبعة وغير المشبعة

Author: Suhail. A. A. KHATTAB سهيل إدريس عبد القادر خطاب
Journal: AL Rafdain Engineering Journal مجلة هندسة الرافدين ISSN: 18130526 Year: 2010 Volume: 18 Issue: 1 Pages: 13-27
Publisher: Mosul University جامعة الموصل

Loading...
Loading...
Abstract

Abstract Failure of earth dams can be caused also by seepage problems, foundation instability, deformation, surface sliding, and earthquakes. The most critical conditions that may cause failure of the embankment are: differential settlement, development of shearing within the embankment and foundation, and development of seepage through the embankment and foundation. The stability and factor of safety against Mosul dam embankment sliding are determined considering a possible rapid drawdown and earthquake conditions and using three methods. Unsaturated condition was considered assuming the shear strength parameter (b) to be (0, 0.5, ). GEO-SLOPE OFFICE was used as the analytical tool to simulate both seepage, slope stability, and earthquake. Seepage through dam was analyzed for three period rapid drawdown of water level (30,21,8 day) with the associated saturated-unsaturated transient seepage. The main results indicated that the minimum slope stability factors of safety were reached using Bishop method and was achieved during 8 day water drawdown and within the second day which indicates the most critical case.Keywords: Seepage, MOSUL Dam, Finite Element, Slope Stability, Rapid Drawdown, unsaturated soil mechanics.

الخلاصة فشل السدود الترابية يمكن أن يكون نتيجة لمشاكل التسرب وعدم ثبوتية الأسس بالإضافة إلى انزلاق السطح بسبب الهزة الأرضية. إن أكثر الظروف الحرجة التي قد تسبب انهيار المنشأ الترابي هي: الهبوط التفاضلي، نشوء قوى قص خلال الاملائيات والأسس، ونشوء وظهور الجريان خلال الاملائيات والأسس. تم إيجاد ثبوتية وعامل الأمان لاملائيات سد الموصل بالأخذ بنظر الاعتبار أمكانية حدوث تفريغ سريع للمياه أو هزة أرضية وباستخدام عدد من طرق التحليل. اخذ بنظر الاعتبار في التحليل الحالة المشبعة والغير المشبعة لتربة لباب السد وبفرض معاملات القص الغير المشبعة(b) مساوية إلى (0,0.5,) ، استخدم برنامج GEO-SLOPE OFFICE في التحليل. تم تحليل التسرب خلال السد الترابي بثلاث احتمالات لتفريغ المياه خلال (30,21,8) يوما ومن خلال التحليل الانتقالي للتسرب خلال الترب المشبعة وغير المشبعة. أظهرت أهم النتائج إن الحد الأدنى لمعاملات ثبوتية المنحدرات التي تم استنتاجها من خلال استخدام طريقتي (Bishop & Lowe-Karafiath). كما تم استنتاج أن الحالة الحرجة كانت خلال ظروف التفريغ السريع للمياه خلال (8) أيام وخلال اليوم الثاني.