research centers


Search results: Found 187

Listing 1 - 10 of 187 << page
of 19
>>
Sort by

Article
Problem and difficulties faced by the application of the Activity – Based Costing ABC Approach in Iraq Industrial companies ( A Study In number of Industrial Companies )
مشاكل وصعوبات تطبيق مدخل التكاليف على أساس الأنشطة في الشركات الصناعية العراقية (( دراسة ميدانية في عدد من الشركات الصناعية بمحافظة البصرة ))

Author: جليل ابراهيم صالح
Journal: journal of kirkuk University For Administrative and Economic Sciences مجلة جامعة كركوك للعلوم الادارية والاقتصادية ISSN: 22222995 Year: 2013 Volume: 3 Issue: 1 Pages: 188-213
Publisher: Kirkuk University جامعة كركوك

Loading...
Loading...
Abstract

Abstract The research aims to identify the problems and difficulties faced by the Iraq Industrial companies in the application of Activity – Based Costing Approach . the research indicate that the Iraq Industrial companies faced a lot of difficulties in the application of Activity – Based Costing ( ABC ) Approach with medium degree in general . also the research indicated that some of the difficulties were highly as in the case of the absence of accounting legislation in Iraq that obligation the companies to application a new system for costing . non – existence of the guideness role from accounting auditors in awareness the management companies with the importance and advantages of this Approach . In addition there are some difficulties with medium degree as in the case of Non-adopt Standards and accounting rules belong Iraq's environment . the high cost of the Activity – Based Costing ( ABC ) Approach application . The research present a series recommendation , including the issuance of legislation and the adoption of accounting standards and a special accounting rules related to the Iraq's environment that obligation companies to application new Approach for costing . the research focus on the role of accounting auditors ot indicative or guideness for raising the Knowledge to the Iraq companies management with importance merits of the ABC . The universities and colleges to hold training courses and awareness programs on the Activity – Based Costing ( ABC ) .

المستخلص يهدف هذا البحث إلى التعرف على المشاكل والصعوبات التي تواجه الشركات الصناعية العراقية في تطبيق مدخل التكاليف على أساس الأنشطة . ويوضح البحث أن الشركات الصناعية العراقية تواجه مجموعة من الصعوبات في تطبيق مدخل التكاليف على أساس الأنشطة فيها وبدرجة متوسطة بصورة عامة ، كما أوضح أن بعض الصعوبات كانت بدرجة مرتفعة كما هو الحال في عدم وجود تشريعات محاسبية في العراق تلزم الشركات بتطبيق أنظمة حديثة للتكاليف وعدم وجود دور أرشادي أو توجيهي من مدققي الحسابات في توعية أدارة الشركات بأهمية ومزايا مدخل التكاليف على أساس الأنشطة . كما أن درجة بعض الصعوبات كانت متوسطة مثل عدم تبني معايير وقواعد محاسبية تخص البيئة العراقية وارتفاع تكلفة تطبيق مدخل التكاليف على أساس الأنشطة . وقد توصل البحث إلى مجموعة من التوصيات منها إصدار تشريعات محاسبية وتبني معايير وقواعد محاسبية خاصة بمدخل التكاليف على أساس الأنشطة ( ABC ) تخص البيئة العراقية تلزم الشركات بتطبيق مداخل حديثة للتكاليف كمدخل التكاليف على أساس الأنشطة ( ABC ) ، وأن يقوم مدققي الحسابات بدور أرشادي أو توجيهي لتوعية أدارة الشركات بأهمية ومزايا مدخل التكاليف على أساس الأنشطة ( ABC ) ، وأن تعمل الجامعات كمراكز استشارية ومعلوماتية متخصصة لتطوير أنظمة التكاليف الحديثة وتطوير برامج الكمبيوتر اللازمة لاستخدامها في تشغيل مدخل التكاليف على أساس الأنشطة .

Keywords

cost --- التكاليف


Article
Strategic framework of Relevant Cost Analysis
الاطار الستراتيجي لتحليل الكلف الملائمة دراسة نظرية تحليلية في المنظمات غير الهادفة للربح

Author: Mohammed H. Al-shujairi
Journal: Al-Rafidain University College For Sciences مجلة كلية الرافدين الجامعة للعلوم ISSN: 16816870 Year: 2009 Issue: 24 Pages: 26-40
Publisher: Rafidain University College كلية الرافدين الجامعة

Loading...
Loading...
Abstract

Traditionally, the relevant cost analysis is one of the best sources of cost information for short – terms management decision making. While , depending on this cost information without strategic vision considers a significant risk through its impact on long – term strategic planning in the context of business environment that addressed with complexly, high competition and the dominance oh strategic thinking . In this context , the aim of this research is to explain the nature of short- term management decision making process depended upon relevant cost analysis in term of strategic planning and that issues which adopted by organizations . This research has been depended on identifying variables and relationships among them in its theoretical context. While it depends quantification analytical on identifying this theme by non – profit organizations for specialization and importance of this activity in social and economy life, especially in Iraq.

يعد تحليل الكلف الملائمة تقليدياً ابرز مصادر المعلومات الكلفوية لعملية اتخاذ القرارات الادارية قصيرة الاجل ، فيما يعتبر الاعتماد على مصدر المعلومات هذا دون رؤية استراتيجية بالغ الخطورة في تاثيره على الخطط الستراتيجية طويلة الامد في ظل بيئة الاعمال التي تتسم بالتعقيد والتنافس الشديد وسيادة التفكير الستراتيجي . وفي اطار ذلك يستهدف البحث ايضاح طبيعة عملية اتخاذ القرارات الادارية قصيرة الاجل بالاعتماد على تحليل الكلف الملائمة في ظل المسائل والخطط الستراتيجية طويلة الاجل . ولتحقيق ذلك اعتمد البحث في اطاره النظري على ايضاح متغيراته والعلاقات فيما بينها . فيما تم اعتماد التحليل الكمي في تحقيق ذلك من خلال المنظمات غير الهادفة للربح لخصوصية واهمية مثل هذه الانشطة على الصعيد الاجتماعي والاقتصادي وفي العراق على وجه الخصوص


Article
EVALUATION OF CEFOTAXIME USE IN BAQUBA TEACHING HOSPITAL
تقييم استعمال عقار سيفوتاكسيم في مستشفى بعقوبة التعليمي

Loading...
Loading...
Abstract

Antibiotics are one of the most commonly prescribed drugs today. Rational use of antibiotics is extremely important as injudicious use can adversely affect the patient, cause emergence of antibiotic resistance and increase the cost of health care; Antibiotics resistance is out of the scope of this study.

تعتبر المضادات الحيوية من اكثر الأدوية التي توصف بشكل عشوائي،وان الاستعمال الرشيد لهذه المضادات الحيوية يعتبر من أهم الأهداف في العملية العلاجية وعكس ذلك تحصل الكثير من المشاكل التي تظهر على المريض نتيجة الاستعمال غير الصحيح للمضادات الحياتية وكذلك تؤدي إلى ظهور سلالات من البكتريا مقاومة لهذه المضادات بالإضافة إلى الكلف الباهضة لهذه المضادات الحيوية. تم إجراء الدراسة على 686 مريضا من مختلف الأعمارومن كلا الجنسين ، والذي تم وصف عقار سيفوتاكسم لهم لمختلف الأسباب المرضية في مستشفى بعقوبة التعليمي، ديالى، العراق. وتم اختيار هؤلاء المرضى من مجموع 4078 مريضا وهو العدد الكلي للمرضى الداخلين إلى المستشفى خلال ثلاثة اشهر. تم تقسيم هؤلاء المرضى إلى مجموعتين: مجموعة A وتتكون من 650 مريضا تم وصف عقار سيفوتاكسم لهم من قبل الأطباء الاختصاص بدون الاعتماد على الأسس القياسية العالمية المتبعة في وصف المضادات الحيوية، قورنت مع مجموعة B والتي تتألف من 36 مريضا تم وصف عقار سيفوتاكسم لهم بالاعتماد على الأسس القياسية العالمية لوصف المضادات الحياتية. لكلا المجموعتين تم اخذ معلومات المرضى والتي تتضمن العمر، الجنس، التشخيص، عدد الأيام التي تم إعطاء عقار سيفوتاكسم فيها للمريض، الجرعة، التحاليل المختبرية، التداخلات الدوائية إن وجدت بالإضافة إلى عدة متغيرات أخرى صممت حسب طبيعة هذه الدراسة. أظهرت نتائج هذه الدراسة انه بالاعتماد على الأسس القياسية العالمية في وصف المضادات الحيوية حدث تحسن كبير في نسب الجرع الصحيحة المعطاة للمرضى، انخفاض نسبة حدوث التداخلات الدوائية، انخفاض نسبة الاستعمال غير الرشيد لهذا العقار وكذلك انخفاض ملحوظ في كمية عقار سيفوتاكسم وكلفة هذا العقار المصروف خلال شهر واحد.ومن خلال نتائج هذه الدراسة يمكن الاستنتاج بان اتباع الأسس القياسية العالمية في وصف المضادات الحيوية وكذلك مشاركة الصيدلي السريري في الفريق الطبي والعملية العلاجية قد احدث تغيرا ملحوظا في عدة متغيرات أدت إلى استفادة كبيرة للمرضى الراقدين وللمستشفى وكذلك منع حدوث العديد من المشاكل مثل التأثيرات الجانبية والكلفة العلاجية الباهضة وأدى إلى تحقيق الحلم الذي يراود الكثير من المختصين بالعملية العلاجية وهو الاستعمال الرشيد للمضادات الحيوية.

Keywords

cefotaxime --- antibiotic --- Cost.


Article
Life-Cycle Cost Analysis for Three Different Types of A/C Systems Applied on an Apartment Located in a Multi-Floors Residential Tower in Mosul City
تحليل كلفة العمر الافتراضي لثلاث منظومات مختلفة لتبريد وتكييف الهواء لشقة متواجدة في برج سكني متعدد الطوابق في مدينة الموصل

Author: Badran Mohammed Salim
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2014 Volume: 32 Issue: 9 Part (A) Engineering Pages: 2134-1147
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

This research studies the life cycle cost analysis using detailed cooling and electrical load profiles to calculate initial and running costs to evaluate the economic feasibilities of three different types of air conditioning systems as residential air conditioning system (RACs), commercial air conditioning system (CACs) and multi power air conditioning system (MPACs). The present-worth cost method for life-cycle cost period for ten (10) years analysis is applied to a sample building located in Mosul city / Iraq so as to select the best air conditioning system. The cooling load temperature differential with cooling load factor (CLTD/CLF) was used with hourly analysis program (HAP v4.6) for the estimation cooling load in each room of apartment.The results showed that the RAC system is lower than CAC and MPAC systems in initial cost approximately 53% and 67% respectively and the running cost for CAC system is lower than RAC and MPAC systems approximately 12% and 7% respectively for one month. The the total cost for two systems RAC and CAC are equal after 20 months of the beginning run and after even break point (BEP) the total cost for CAC system began to decline which indicates there is save in electric consumption and present worth cost over a period of (10) ten years after operation interval. The CAC system uses duct always to distribute air into each condition zone, therefor this system gives less noise of air distribution with best interior aesthetic appearance so that it fits with the interior decoration for each rooms of apartment. The outdoor unit of CAC system doesn’t appearance because the system working for long distances and can put outdoor units on the roof of the building.

يتضمن البحث الحالي تحليل كلفة العمر الافتراضي لثلاث منظومات مختلفة لتبريد وتكييف الهواء وكانت على النحو التالي منظومة تبريد وتكييف منزلية ومنظومة تبريد وتكييف تجارية ومنظومة تبريد وتكييف متعددة الاحمال حيث تم دراسة الكلفة الاولية والكلفة التشغيلية للمنظومات المختلفة بالاعتماد على مخطط الاحمال الحرارية والاحمال الكهربائية لنموذج شقة سكنية تقع في برج متعدد الطوابق في مدينة الموصل / العراق ، تم أعتماد طريقة فرق درجات حرارة مع عامل تصحيح حمل التبريد (CLTD/CLF) وبرنامج تحليل الساعات (HAP) أصدار (4.6) من شركة كاريير لحساب احمال التبريد الخاصة بالشقة السكنية. تم ملاحظة أن منظومة التبريد والتكييف المنزلية (RACs) تكون كلفتها الاولية اقل بمقدار 53% عن منظومة التبريد والتكييف التجارية (CACs) و67% عن منظومة التبريد والتكييف متعددة الاحمال (MPACs) وأن الكلفة التشغيلية لمدة شهر واحد فقط لمنظومة التبريد والتكييف التجارية هي أقـل من منظومة التبريد والتكييف المنزلية ومنظومة التبريد والتكييف متعددة الاحمال بمقدار 7% و 12% على التوالي، كذلك تم استنتاج أن منظومة التبريد والتكييف التجارية هي أفضل من ناحية الكلفة الكلية (المتمثلة بالكلفة الاولية والتشغيلية) لمدة تشغيلية مقدارها (10) عشر سنوات وأنه بعد مرور ((20 شهر من التشغيل الاولي للمنظومات الثلاث سيحدث تطابق في قيم الكلف الكلية لمنظومتي التبريد والتكييف التجارية والمنزلية وبعد تجاوز نقطة التطابق (EBP) سيتم عمل منظومة التبريد والتكييف التجارية مع ربح من ناحية الكلفة التشغيلية على مدار السنوات المتعاقبة وهذا يمثل الربح في اختيار هذا النوع من المنظومات الثلاث، فضلا عن ان منظومة التبريد والتكييف التجارية تستخدم مجرى هوائي دائماً لتمرير الهواء من الوحدة الداخلية وصولاً الى الحيز المراد تكييفه وبالتالي سيتم التحكم من خلال تصميم المجرى الهوائي بمقدار الضوضاء التي يصدرها الهواء الخارج من موزع الهواء لكل حيز مع وجود تناسق كبير بين اشكال والوان موزعات الهواء التي ستكون ملائمة مع التصميم الداخلي لكل حيز. إن منظومة التبريد والتكييف التجارية (CACs) تعمل لمسافات طويلة وبذلك سيكون من السهل جداً وضع الوحدة الخارجية على سطح البرج السكني وبالتالي المحافظة على المظهر الخارجي للبرج السكني .


Article
Economic Feasibility Study of Modern and Conventional Central Heating Systems for Villa Located in Duhok City, Iraq

Authors: B.M. Salim --- I.F. Abdulqadir --- F.M. Younis
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2017 Volume: 35 Issue: 7 Part (A) Engineering Pages: 725-736
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

This research includes the evaluation of economic feasibilities based on the Iraqi’s market cost by using three different types of central heating systems in a residential villa located in Duhok city / Iraq. It also compares between modern and conventional central heating systems. A life cycle cost analysis based on detailed heating and operation load profiles considered in this work. Initial, running and maintenance costs for three central heating systems examined for fifteen years as a working period. The used systems in this study were; modern central heating system (heat pump water heater system) and conventional central heating system (fuel oil hot water boiler system and electric hot water boiler system). Transfer function method with hourly analysis program platform (HAP4.9) used for estimation the heating loads within each zone of the project. The proposed technique of modern central heating system found to be more efficient for thermal and economic efficiencies and it uses an environmentally friendly refrigerant such as (R410A). It also works efficiently in severe cold climate with low temperature of (-20°C) in winter season. The results shows that the heat pump water heater central heating system is most efficient system, this system has provided an energy saving range up to 57.5% compared with electric hot water boiler system and 70.6% compared with fuel oil hot water boiler system.


Article
COMPARATIVE ANALYSIS BETWEEN MODERN AND CONVENTIONAL HVAC SYSTEMS FOR USE AT COMMERCIAL BUILDING IN BAGHDAD CITY / IRAQ
تحميل مقارن لمنظومات التبريد والتكييف الحديثة والتقليدية لبناية تجارية في مدينه بغداد / العراق

Authors: Dr. Nabil J. Yasin د.نبيل جميل ياسين --- Badran M. Salim بدران محمد سالم
Journal: AL-TAQANI مجلة التقني ISSN: 1818653X Year: 2017 Volume: 30 Issue: 6 Pages: E47-E63
Publisher: Foundation of technical education هيئة التعليم التقني

Loading...
Loading...
Abstract

This research use the life cycle cost analysis and a detailed cooling, heating and electrical load profiles to determine the initial, running and maintenance costs for evaluation the economic feasibilities of using three different types of central air conditioning systems in a commercial building located in Baghdad city / Iraq, so as to select the best air conditioning system. The systems were modern air conditioning system (variable refrigerant flow), all air conditioning system (package roof top unit) and all water air conditioning system (fan coil unit). The present-worth cost method for lifecycle cost period for fifteen years analysis is applied. The transfer function method was used with hourly analysis program (HAP v4.9) for estimation the cooling and heating loads in each space of the building with adopted the indoor air quality in the design as adequate fresh air per person, acceptable noise level and air quality. The comparison between the different methods for the total cost (during fifteen years) for air conditioning systems showed that the variable refrigerant flow system has lowest total cost compare with other methods used for the period operation, so as the variable refrigerant flow air conditioning system worked into variable cooling and heating load between 0% and 100% of total load.

يتضمن البحث الحالي اجراء تحميل لكمفة العمر الافتراضي وحسابات احمال التبريد والتدفئه بالاضافه الى الأحمال الكهربائية لتحديد الكلفه الاوليه وكلفه الصيانه وكلفة التشغيل لثلاث أنواع مختلفة من منظومات التكييف المركزيه التي تعمل في نموذج لبنايه تجاريه )مول( تقع في مدينه بغداد/العراق. المنظومات كانت عمى النحو التالي منظومة تبريد وتكييف هواء مركزية نوع هواء كمي ومنظومة تبريد وتكييف هواء مركزية نوع ماء كمي ومنظومة تبريد وتكييف هواء مركزية حديثة. تم اعتماد طريقة دالات التحويل مع برنامج ) HAP ( نسخة 4.9 لأيجاد احمال التبريد والتدفئة الخاصة بكل حيز من المول مع الاخذ بنظر الاعتبار توفير شروط جودة الهواء الداخلي ) IAQ ( التي تخص توفير هواء نقي لكل شخص ويكون الهواء المجهز ذو نقاوة جيدة بالاضافة الى توزيع الهواء بدون ضوضاء تؤثر عمى راحة الانسان في داخل الحيز المشغول ، من خلال مقارنة الكلفة الكمية لمنظومات التبريد والتكييف المركزية وخلال مدة تشغيلية قدرها خمسة عشر عام تبين ان الاختيار الامثل والمناسب لهذا المشروع هو منظومة تبريد وتكييف هواء مركزية حديثة ) VRF (لانها تعمل حفظ لمطاقة وبالتالي تكون صرفيات الطاقة أقل من المنظومات الاخرى فضلا عن عمل المنظومة بحمل جزئي للتبريد او التدفئة متغيير يترواح بين % 0 الى 100 % ..


Article
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
موديل رياضي لأمثلية الوقت والكلفة الانشائية بأستخدام امثلية مستعمرة النمل

Authors: Mohammed Nooruldeen Azeez --- Angham Alsaffar
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2014 Volume: 20 Issue: 1 Pages: 114-131
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities. In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm.

ان الوقت والكلفة هي اهم العوامل المأخوذة في تخطيط اي مشروع، في اختصاص ادارة المشاريع الانشائية. وان العلاقة بين الوقت والكلفة معقدة. فأن الكلفة الكلية في اي مشروع تمثل مجموع الكلف المباشرة وغير المباشره، وتمثل الكلف المباشره كلف العمالة والمواد والمعدات ، الخبينما الكلف غير المباشره تمثل بصورة عامة مصاريف الاشراف و الاداريات والاستشارية اضافة الى الفوائد.الكلف المباشرة تزداد بنسبة كلما طال عمر المشروع عن عمره المقرر ، بينما الكلف غير المباشره تستمر طيلة عمر المشروع وان اي تقليل في مدة المشروع عن المدة المحددة تعني تقليل الكلف غير المباشره ، لذا فان هنالك مقايضة بين الكلفة والوقت في اكمال الفعاليات الانشائية.في هذا البحث ، سوف يتم انشاء موديل لحساب امثلية الوقت-الكلفة الانشائية. توليد حلول مثلى عالمية للوقت والكلفة, تقليل الوقت والكلفة بأستخدام طريقة مستعمرة النمل.


Article
Forecasting the Final Cost of Iraqi Public School Projects Using Regression Analysis
التنبؤ بالكلفة النهائية لمشاريع المدارس العراقية الحكومية بطريقة تحليل الانحدار

Authors: Zeyad S. M. Khaled --- Qais Jawad Frayyeh --- Gafel Kareem Aswed
Journal: Engineering and Technology Journal مجلة الهندسة والتكنولوجيا ISSN: 16816900 24120758 Year: 2015 Volume: 33 Issue: 2 Part (A) Engineering Pages: 477-486
Publisher: University of Technology الجامعة التكنولوجية

Loading...
Loading...
Abstract

The actual final cost of public school building projects, like other construction projects, is unknown to the owner till the final account statement is prepared. An attempt to predict the final cost of such projects before work starts, using backward elimination regression analysis technique is carried out. The study covers two story (12 classes) school projects awarded by the lowest bid system. Records of (65) school projects completed during (2007-2012) are employed to develop and verify the regression model. Based on experts ‘convictions, nine factors are considered to have the most significant impact on the final cost. Hence they are used as model input parameters. These factors are; awarded bid price, average bid price, estimated cost, contractor rank, resident engineer experience, project location, number of bidders, year of contracting, and contractual project duration. It was found that the developed regression model have the ability to predict the final cost (FC) for school projects, as an output, with a very good accuracy having a correlation coefficient (R) of (93%), determination coefficient (R2)of(86.5%)and average accuracy percentage of(92.02%).

تبقى الكلفة النهائية الحقيقية لمشاريع المدارس،كغيرها من المشاريع الإنشائية، غير معروفة لرب العملحتى يتماعداد الحساباتالختامية.تم في هذا البحث استخدام تقنية تحليل الانحداربطريقة الحذف لأجل التنبؤ بالكلفة النهائية لمشاريع المدارس قبل بدء العمل بالمشروع. وقد شملت الدراسة تحليل بيانات (65) مشروع مدرسة بطابقين، ذات (12) صف، محالة بنظام الإحالة لأوطأ العطاءات. جميعها مكتملة البناء ومستلمة استلاماً نهائياً من قبل رب العمل خلال السنوات (2007-2012). وقد تم تحديد تسع عوامل اساسية مؤثرة في الكلفة النهائية لمثل هذه المشاريع، وذلك من خلال استبيان أراء ذوي الخبرة والاختصاص،وتم استخدامها كمدخلات في بناء النموذج الرياضي للتنبؤ بالكلفة النهائية.وهذه العوامل هي : سعر العطاء الفائز,ومعدل اسعار العطاءات,والكلفة التخمينية,ودرجة تصنيف المقاول,وخبرة المهندس المقيم,وموقع المشروع,وعدد المناقصين,وسنة التعاقد,ومدة التنفيذ التعاقدية.ولقد تبين من الدراسةأنالنموذج المعتمدلها القدرةعلى التنبؤبالكلفةالنهائية لمشاريع المدارس، كمخرج للنموذج،بدرجةعالية من الدقة وبمعامل ارتباط يساوي(93٪)،ومعامل تحديد يساوي(86.5٪)، ومتوسط نسبة دقة يساوي(92.02٪).


Article
Delay – Cost Analysis For a Section Of Baghdad – Kirkuk Highway
تحليل الكلفة لطريق بغداد كركوك

Authors: Atheer N. Hameed اثير ناجي حميد --- Ali J. Kadhim علي جبار كاظم
Journal: Journal of Engineering and Sustainable Development مجلة الهندسة والتنمية المستدامة ISSN: 25200917 Year: 2011 Volume: 15 Issue: 4 Pages: 227-240
Publisher: Al-Mustansyriah University الجامعة المستنصرية

Loading...
Loading...
Abstract

This study aims to analyzing the delay – cost for a section of Baghdad - Kirkuk highway; this section (16 km length) has a lane width of 10 ft and shoulder width of 4 ft in each direction. The study results show that the average traffic delay for the studied section is (3 minute). The cost resulting from this delay for passengers and freights which had a negative effect on the Gross National Product [G.N.P] is (390,003,982 I.D./year).

تهدف هذه الدراسة إلى تحليل كلفة التأخير لمقطع من طريق بغداد – كركوك، هذا المقطع (16 km) له ممر واحد بعرض (10) قدم وأكتاف بعرض (4) قدم في كل اتجاه. أظهرت نتائج الدراسة أن معدل التأخير المروري للمقطع المدروس هو (3 دقائق). الكلفة الناتجة عن هذا التأخير للمسافرين والبضائع والتي لها تأثير سلبي على الناتج الإجمالي القومي تبلغ (390,003,982 دينار عراقي).


Article
“ Techniques of the strategic cost management ”
" تقنيات إدارة الكلفة الإستراتيجية

Authors: Haydar sh. Noory حيدر شاكر نوري --- Mhmood h. jmaa محمود حسن جمعة
Journal: Journal of Research Diyala humanity مجلة ديالى للبحوث الانسانية ISSN: 1998104x Year: 2014 Issue: 63 Pages: 345-384
Publisher: Diyala University جامعة ديالى

Loading...
Loading...
Abstract

This research Management of strategic cost deals with the basic concepts (cost concept, strategic cost, cost management applications, decision make process and strategic cost analysis, strategic cost), as well as important techniques of the least andthe strategic cost management (activity based costing systems, activity based management, product life cycle costing, target costing, value chain analysis, business reengineering process , benchmarking, just in time, total quality management, balanced scorecard, theory of constraints, mass customization), the research found set of conclusions, one of the most important thinks was that techniques of the strategic cost management does not lead only to achieve savings in cost but even to achieve the rest of the critical factors of success ( quality, customer satisfaction ,innovation and learning. the research concluded with many suitable recommendations.

يتناول هذا البحث المفاهيم الأساس لإدارة الكلفة الإستراتيجية (الكلفة والكلفة الإستراتيجية وتطبيقات إدارة الكلفة وعملية اتخاذ القرار وتحليل الكلفة الإستراتيجيةوإستراتيجية الكلفة الأقل)، فضلاً عن أهم تقنيات إدارة الكلفة الإستراتيجية (نظم المحاسبة المستندة على النشاط والإدارة المستندة على النشاط ونظام تحديد تكلفة دورة حياة المنتج ونظام تحديد الكلفة المستهدفة وتحليل سلسلة القيمة وعملية إعادة هندسة الأعمال والمقارنة المرجعية ونظام الإنتاج في الوقت المحدد وإدارة الجودة الشاملة وبطاقة الأداء المتوازن ونظرية القيودوالإيصاء الواسع)، وتوصل البحث إلى مجموعة استنتاجات، مفادها إن استخدام تقنيات إدارة الكلفة الإستراتيجية لا يؤدي إلى تحقيق وفورات في الكلفة فقط ، وإنما يمتد أثرها ليشتمل على تحقيق باقي عوامل النجاح الحرجة والمتمثلة بالجودة، ورضا الزبون، والإبداع والتعلم، وإنتهى البحث بمجموعة من التوصيات المناسبة.المصطلحات الرئيسة في البحث: الكلفة ، إدارة الكلفة الإستراتيجية، التكاليف المستندة على النشاط ، الإدارة المستندة على النشاط ، نظام تكلفة دورة حياة المنتج ، نظام الكلفة المستهدفة ، تحليل سلسلة القيمة ، عملية إعادة هندسة الأعمال ، المقارنة المرجعية ، نظام الإنتاج في الوقت المحدد ، إدارة الجودة الشاملة ، بطاقة الأداء المتوازن ، نظرية القيود .

Listing 1 - 10 of 187 << page
of 19
>>
Sort by
Narrow your search

Resource type

article (187)


Language

Arabic (66)

Arabic and English (59)

English (58)


Year
From To Submit

2019 (22)

2018 (25)

2017 (24)

2016 (18)

2015 (19)

More...