research centers


Search results: Found 3

Listing 1 - 3 of 3
Sort by

Article
An Imperialist Competitive Algorithm for Sitting and Sizing of Distributed Generation in Radial Distribution Network to Improve Reliability and Losses Reduction

Authors: Farzaneh Ostovar --- Mahdi Mozaffari Legha
Journal: Iraqi Journal for Electrical And Electronic Engineering المجلة العراقية للهندسة الكهربائية والالكترونية ISSN: 18145892 Year: 2013 Volume: 9 Issue: 2 Pages: 59-66
Publisher: Basrah University جامعة البصرة

Loading...
Loading...
Abstract

Distributed Generation (DG) can help in reducing the cost of electricity to the costumer, relieve network congestion and provide environmentally friendly energy close to load centers. Its capacity is also scalable and it provides voltage support at distribution level. Hence, DG placement and penetration level is an important problem for both the utility and DG owner. The Optimal Power Flow (OPF) has been widely used for both the operation and planning of a power system. The OPF is also suited for deregulated environment.Four different objective functions are considered in this study: (1) Improvement voltage profile (2) minimization of active power loss (3) maximum capacity of conductors (4) maximization of reliability level. The site and size of DG units are assumed as design variables. The results are discussed and compared with those of traditional distribution planning and also with Imperialist competitive algorithm (ICA).


Article
Planning of Distribution Networks in Baghdad City
تخطيط شبكات التوزيع في مدينة بغداد

Authors: Dr. Thamir M. Abdul-Wahhab د. ثامر محمد عبد الوهاب --- Adeeb Nasser Hussein أديب ناصر حسين
Journal: Journal of Engineering مجلة الهندسة ISSN: 17264073 25203339 Year: 2015 Volume: 21 Issue: 2 Pages: 66-86
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

Planning of electrical distribution networks is considered of highest priority at the present time in Iraq, due to the huge increase in electrical demand and expansions imposed on distribution networks as a result of the great and rapid urban development.Distribution system planning simulates and studies the behavior of electrical distribution networks under different operating conditions. The study provide understanding of the existing system and to prepare a short term development plan or a long term plan used to guide system expansion and future investments needed for improved network performance.The objective of this research is the planning of Al_Bayaa 11 kV distribution network in Baghdad city based on the powerful and efficient CYMDist software as a tool for the simulation and analysis of the network.The planning method proposed in this thesis is to reach the optimum operating conditions of the network by combining the network reconfiguration in sequence with the insertion of capacitors with optimal sizing and locations. The optimum performance of the network is achieved by reducing losses, improving voltage profile and alleviating overload for transformers and cables.

يعد تخطيط شبكات التوزيع الكهربائية من الأولويات في الوقت الحاضر في العراق نظراً للزيادة الهائلة في الأحمال الكهربائية و التوسعات المفروضة على الشبكات نتيجة التطور العمراني الكبير والسريع.تخطيط منظومة التوزيع يحاكي ويدرس سلوك شبكات التوزيع الكهربائية في ظل ظروف تشغيل مختلفة. الدراسة توفر فهم المنظومة القائمة وإعداد خطة تنموية قصيرة الأجل أو خطة طويلة المدى تستخدم لتوجيه التوسع في المنظومة والاستثمارات المستقبلية اللازمة لتحسين أداء الشبكة.الهدف من البحث هو تخطيط شبكة توزيع كهرباء البياع kV 11 في مدينة بغداد استناداً الى برمجيات CYMDist ذات القدرة والكفاءة العالية كأداة لتمثيلها حاسوبياً و اجراء التحليلات عليها.ان طريقة التخطيط المقترحة في هذه الأطروحة للوصول الى حالة الأداء الأمثل للشبكة هي بأجراء عملية تغيير طوبوغرافية الشبكة بالتعاقب مع ادخال متسعات بسعات محسوبة وفي اماكن مثالية في منظومة التوزيع. ويتحقق الأداء الأمثل للشبكة بتقليل المفاقيد, وتحسين الجهد (voltage profile) ومعالجة مشكلة الحمل الزائد للمحولات والمغذيات.


Article
The role of my style (CPM / PERT) in enhancing the performance of construction projectsAn Empirical Study in the Department of projects in the office of the province of Baghdad
دور إسلوبي (CPM/PERT) في تعزيز أداء المشاريع الإنشائية دراسة تطبيقية في قسم المشاريع في ديوان محافظة بغداد

Authors: فضيلة سلمان داود --- زينب هادي حسين المواشي
Journal: journal of Economics And Administrative Sciences مجلة العلوم الاقتصادية والإدارية ISSN: 2227 703X / 2518 5764 Year: 2016 Volume: 22 Issue: 94 Pages: 84-111
Publisher: Baghdad University جامعة بغداد

Loading...
Loading...
Abstract

This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hematology center in dignity Teaching Hospital - Baghdad, draw Action Network according to the "three times (optimistic, pessimistic and most likely") own technology as a result of conditions is confirmed that surrounds the circumstances of the implementation of the project, And find the critical path and determine how long speculative to complete the project and the cost of speculative, with the ratio calculated the probability of completion of the project, was used ready-made computer programs in ways that networking planning to process the data and get the results and draw retinas projects respondents, and programs It was used (MS Project, Win-QSB) , The study showed that for the application of my style (CPM / PERT) a major role in providing the most important project resources, a "time", and his consequential of the rationalization of costs, while providing alternatives and provide the perfect solution for trade-off between time and cost of a school project, and indicate the possibility of ending the project blood disease center within the period Selected according to his work Bert network, and this researcher recommended the beneficiary of activating the role of planning research using networking planning methods and it is important for their role in the implementation and follow-up performance boost construction.

جاءت هذه الدراسة لبيان دور إستخدام أساليب تخطيط علمية غير مفعلة وقليلة الإستخدام في تخطيط ومتابعة المشاريع الإنشائية الحيوية في محافظة بغداد ومنها أساليب التخطيط الشبكي ،بهدف إيجاد الوقت الأمثل لإنهاء المشروع في ظل الموارد المتاحة والميزانية المحددة له ،في البحث الحالي تم إستخدام أبرز أساليب التخطيط الشبكي وهما إسلوبي (CPM/PERT)، وتم تطبيق طريقة المسار الحرج على مشروع المدرسة ذات التصميم الموحد (القياسي) في محافظة بغداد ورسم شبكة العمل وفق الأوقات المؤكدة لأنشطة المشروع وحساب الوقت التعجيلي له مع تقديم عدة بدائل للمبادلة بين الزمن والكلفة وإيجادة البديل الأمثل ،وتم تطبيق تقنية بيرت على مشروع مركز أمراض الدم في مستشفى الكرامة التعليمي – بغداد ،ورسم شبكة العمل وفقا" للأوقات الثلاثة (المتفائل ،المتشائم و الوقت الأكثر إحتمالا") الخاصة بالتقنية نتيجة للظروف غير المؤكدة التي تحيط بظروف تنفيذ المشروع ،وإيجاد المسار الحرج وتحديد المدة التخمينية لإنجاز المشروع والكلفة التخمينية ،مع إحتساب نسبة إحتمالية إنجاز المشروع ، وتم إستخدام البرامج الحاسوبية الجاهزة الخاصة بأساليب التخطيط الشبكي لمعالجة البيانات والحصول على النتائج ورسم شبكيات المشروعين المبحوثين ،ومن البرامج التي تم إستخدامها (MS Project , Win-QSB) ،وأظهرت الدراسة إن لتطبيق إسلوبي (CPM/PERT) دورا كبيرا في توفير أهم موارد المشروع وهو "الوقت" وما يترتب على ذلك من ترشيد للتكاليف ،مع توفير بدائل وتقديم الحل الأمثل للمبادلة بين الوقت والكلفة لمشروع المدرسة ، وبيان إمكانية إنهاء مشروع مركز امراض الدم ضمن الفترة المحددة له وفق شبكة العمل بيرت ، هذا واوصت الباحثة الجهة المستفيدة من البحث تفعيل دور التخطيط بإستخدام أساليب التخطيط الشبكي وذلك لدورهما المهم في متابعة التنفيذ وتعزيز الأداء للمشاريع الإنشائية.

Listing 1 - 3 of 3
Sort by
Narrow your search

Resource type

article (3)


Language

English (2)


Year
From To Submit

2016 (1)

2015 (1)

2013 (1)